Implementing Cisco Application Centric Infrastructure (DCACI) 300-620 Practice Test 45
Question 440
Engineers at fictional Morrow Foods want to avoid repeating: A routed external application fails, and the team wants to recreate all tenant EPGs before reading the L3Out protocol faults. Which proposed action is unsafe for this specific reason?
- Rebuild every EPG as the first response to an external BGP neighbor-down fault.
- Configure a routed BGP peer as a substitute for the required external VLAN bridge extension.
- Ignore external spanning tree because ACI itself uses a spine-and-leaf topology.
- Call any pair of cables a redundant vPC without configuring the ACI vPC relationship.
Explanation
Correct Answer
A:The proposed shortcut would preserve the wrong assumption at Morrow Foods. The team should instead implement: Inspect border-leaf L3Out interface, neighbor, route and fault state before changing application contracts.
Incorrect Answers
B:“Configure a routed BGP peer as a substitute for the required external VLAN bridge extension” represents a different ACI defect involving the requested connectivity is Layer 2 while the proposed mechanism is routed L3Out peering. The shortcut sought here preserves the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes, so the relevant answer is “Rebuild every EPG as the first response to an external BGP neighbor-down fault”.
C:“Ignore external spanning tree because ACI itself uses a spine-and-leaf topology” represents a different ACI defect involving external switching loop-prevention behavior was not coordinated with the ACI attachment design. The shortcut sought here preserves the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes, so the relevant answer is “Rebuild every EPG as the first response to an external BGP neighbor-down fault”.
D:“Call any pair of cables a redundant vPC without configuring the ACI vPC relationship” represents a different ACI defect involving the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. The shortcut sought here preserves the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes, so the relevant answer is “Rebuild every EPG as the first response to an external BGP neighbor-down fault”.
Question 441
A Cisco ACI deployment review at fictional Atlas Energy identifies this condition: An APIC VMM domain was created with a stale vCenter address and never discovers the expected datacenter inventory. What is the most appropriate next configuration action?
- Correct the vCenter connection details, credentials and supported integration configuration.
- Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping.
- Attach the VM NIC to the correctly mapped VMM EPG port group and verify endpoint learning.
- Select supported static VLAN mode with an eligible port encapsulation and verify the Nutanix subnet mapping.
Explanation
Correct Answer
A:This change matches the observed ACI failure at Atlas Energy. Correct the vCenter connection details, credentials and supported integration configuration. It corrects the underlying issue that the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details.
Incorrect Answers
B:“Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping” addresses the VMM domain targets a virtual switch other than the one used by the application VMs, but the ACI fault here is the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details. The appropriate implementation is “Correct the vCenter connection details, credentials and supported integration configuration”.
C:“Attach the VM NIC to the correctly mapped VMM EPG port group and verify endpoint learning” addresses vMware virtual-port membership does not match the intended ACI EPG classification, but the ACI fault here is the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details. The appropriate implementation is “Correct the vCenter connection details, credentials and supported integration configuration”.
D:“Select supported static VLAN mode with an eligible port encapsulation and verify the Nutanix subnet mapping” addresses the Nutanix VMM EPG VLAN mode does not implement the required fixed encapsulation, but the ACI fault here is the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details. The appropriate implementation is “Correct the vCenter connection details, credentials and supported integration configuration”.
Question 442
At fictional Atlas Energy, an ACI deployment failed in this way: An APIC VMM domain was created with a stale vCenter address and never discovers the expected datacenter inventory. Which technical cause best explains it?
- The VMM domain targets a virtual switch other than the one used by the application VMs.
- The APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details.
- VMware virtual-port membership does not match the intended ACI EPG classification.
- The Nutanix VMM EPG VLAN mode does not implement the required fixed encapsulation.
Explanation
Correct Answer
B:This is the implicated mechanism, not just a correlated symptom: The APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details. The corrective implementation is to correct the vCenter connection details, credentials and supported integration configuration.
Incorrect Answers
A:“The VMM domain targets a virtual switch other than the one used by the application VMs” would imply the VMM domain targets a virtual switch other than the one used by the application VMs. The observed fabric issue instead points to the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details.
C:“VMware virtual-port membership does not match the intended ACI EPG classification” would imply vMware virtual-port membership does not match the intended ACI EPG classification. The observed fabric issue instead points to the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details.
D:“The Nutanix VMM EPG VLAN mode does not implement the required fixed encapsulation” would imply the Nutanix VMM EPG VLAN mode does not implement the required fixed encapsulation. The observed fabric issue instead points to the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details.
Question 443
For the ACI issue at fictional Atlas Energy: An APIC VMM domain was created with a stale vCenter address and never discovers the expected datacenter inventory. Which finding best demonstrates a successful implementation?
- The EPG-backed port groups appear on the DVS used by the production VMs.
- The VM is classified in the expected tenant EPG and its contract policies apply.
- The APIC VMM domain discovers the intended vCenter and associated inventory objects.
- The Nutanix subnet uses the approved VLAN and the corresponding ACI EPG has consistent encapsulation.
Explanation
Correct Answer
C:The needed validation is specific to this defect: The APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details. The observation that confirms the repair is: The APIC VMM domain discovers the intended vCenter and associated inventory objects.
Incorrect Answers
A:“The EPG-backed port groups appear on the DVS used by the production VMs” could verify the VMM domain targets a virtual switch other than the one used by the application VMs, not the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details. Confirm instead that the APIC VMM domain discovers the intended vCenter and associated inventory objects.
B:The observation is appropriate when vMware virtual-port membership does not match the intended ACI EPG classification. The requested sign-off must instead show: The APIC VMM domain discovers the intended vCenter and associated inventory objects.
D:The observation is appropriate when the Nutanix VMM EPG VLAN mode does not implement the required fixed encapsulation. The requested sign-off must instead show: The APIC VMM domain discovers the intended vCenter and associated inventory objects.
Question 444
Following remediation at fictional Atlas Energy, what recurring validation should guard against this failure returning? The original issue was: An APIC VMM domain was created with a stale vCenter address and never discovers the expected datacenter inventory.
- Repeat a documented regression test confirming: the APIC VMM domain discovers the intended vCenter and associated inventory objects.
- Repeat a documented regression test confirming: the EPG-backed port groups appear on the DVS used by the production VMs.
- Repeat a documented regression test confirming: the VM is classified in the expected tenant EPG and its contract policies apply.
- Repeat a documented regression test confirming: the Nutanix subnet uses the approved VLAN and the corresponding ACI EPG has consistent encapsulation.
Explanation
Correct Answer
A:A scheduled check should confirm that the APIC VMM domain discovers the intended vCenter and associated inventory objects. This helps show the corrected policy relationship remains healthy after future changes.
Incorrect Answers
B:“Repeat a documented regression test confirming: the EPG-backed port groups appear on the DVS used by the production VMs” is a regression check for the VMM domain targets a virtual switch other than the one used by the application VMs. It does not retest the actual failure, the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details; use the case-specific result “Repeat a documented regression test confirming: the APIC VMM domain discovers the intended vCenter and associated inventory objects”.
C:“Repeat a documented regression test confirming: the VM is classified in the expected tenant EPG and its contract policies apply” is a regression check for vMware virtual-port membership does not match the intended ACI EPG classification. It does not retest the actual failure, the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details; use the case-specific result “Repeat a documented regression test confirming: the APIC VMM domain discovers the intended vCenter and associated inventory objects”.
D:“Repeat a documented regression test confirming: the Nutanix subnet uses the approved VLAN and the corresponding ACI EPG has consistent encapsulation” is a regression check for the Nutanix VMM EPG VLAN mode does not implement the required fixed encapsulation. It does not retest the actual failure, the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details; use the case-specific result “Repeat a documented regression test confirming: the APIC VMM domain discovers the intended vCenter and associated inventory objects”.
Question 445
A change reviewer at fictional Atlas Energy sees: An APIC VMM domain was created with a stale vCenter address and never discovers the expected datacenter inventory. Which tempting simplification should be rejected?
- Assume any vCenter DVS can carry a production EPG without matching domain association.
- Rename an unrelated VMware port group to imitate the correct APIC EPG name.
- Assume a dynamic VLAN assignment always equals a required preassigned Nutanix VLAN.
- Create physical access EPG bindings while ignoring the disconnected vCenter VMM integration.
Explanation
Correct Answer
D:The proposed shortcut would preserve the wrong assumption at Atlas Energy. The team should instead implement: Correct the vCenter connection details, credentials and supported integration configuration.
Incorrect Answers
A:“Assume any vCenter DVS can carry a production EPG without matching domain association” represents a different ACI defect involving the VMM domain targets a virtual switch other than the one used by the application VMs. The shortcut sought here preserves the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details, so the relevant answer is “Create physical access EPG bindings while ignoring the disconnected vCenter VMM integration”.
B:“Rename an unrelated VMware port group to imitate the correct APIC EPG name” represents a different ACI defect involving vMware virtual-port membership does not match the intended ACI EPG classification. The shortcut sought here preserves the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details, so the relevant answer is “Create physical access EPG bindings while ignoring the disconnected vCenter VMM integration”.
C:“Assume a dynamic VLAN assignment always equals a required preassigned Nutanix VLAN” represents a different ACI defect involving the Nutanix VMM EPG VLAN mode does not implement the required fixed encapsulation. The shortcut sought here preserves the APIC-to-vCenter management connection is not authenticated or reachable with the required endpoint details, so the relevant answer is “Create physical access EPG bindings while ignoring the disconnected vCenter VMM integration”.
Question 446
Engineers at fictional Nova Aero report: A production vCenter contains multiple DVS instances, but the APIC VMM domain is associated with a testing DVS. Which implementation step should be prioritized?
- Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping.
- Associate or extend the approved dynamic VLAN pool and verify free encapsulation for the EPG.
- Align the DVS uplink teaming and ACI leaf port-channel or vPC policies and test failure behavior.
- Review VM-subnet membership and use the supported migration or recreation workflow for the new VLAN.
Explanation
Correct Answer
A:Choosing this targeted change is preferable to modifying unrelated policies. Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping. The evidence of success should be: The EPG-backed port groups appear on the DVS used by the production VMs.
Incorrect Answers
B:“Associate or extend the approved dynamic VLAN pool and verify free encapsulation for the EPG” addresses the VMM domain does not have an eligible encapsulation VLAN in its associated dynamic pool, but the ACI fault here is the VMM domain targets a virtual switch other than the one used by the application VMs. The appropriate implementation is “Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping”.
C:“Align the DVS uplink teaming and ACI leaf port-channel or vPC policies and test failure behavior” addresses the physical vPC or uplink policy and VMware teaming do not match the supported ACI attachment design, but the ACI fault here is the VMM domain targets a virtual switch other than the one used by the application VMs. The appropriate implementation is “Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping”.
D:“Review VM-subnet membership and use the supported migration or recreation workflow for the new VLAN” addresses the change process ignores Nutanix restrictions on changing a VLAN ID for an occupied subnet, but the ACI fault here is the VMM domain targets a virtual switch other than the one used by the application VMs. The appropriate implementation is “Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping”.
Question 447
After checking the symptoms at fictional Nova Aero: A production vCenter contains multiple DVS instances, but the APIC VMM domain is associated with a testing DVS. Which policy or topology defect is most likely?
- The VMM domain does not have an eligible encapsulation VLAN in its associated dynamic pool.
- The physical vPC or uplink policy and VMware teaming do not match the supported ACI attachment design.
- The VMM domain targets a virtual switch other than the one used by the application VMs.
- The change process ignores Nutanix restrictions on changing a VLAN ID for an occupied subnet.
Explanation
Correct Answer
C:The described topology and policy would produce the symptom because the VMM domain targets a virtual switch other than the one used by the application VMs. The planned fix should be: Associate the VMM domain with the intended supported VMware distributed switch and verify inventory mapping.
Incorrect Answers
A:“The VMM domain does not have an eligible encapsulation VLAN in its associated dynamic pool” would imply the VMM domain does not have an eligible encapsulation VLAN in its associated dynamic pool. The observed fabric issue instead points to the VMM domain targets a virtual switch other than the one used by the application VMs.
B:“The physical vPC or uplink policy and VMware teaming do not match the supported ACI attachment design” would imply the physical vPC or uplink policy and VMware teaming do not match the supported ACI attachment design. The observed fabric issue instead points to the VMM domain targets a virtual switch other than the one used by the application VMs.
D:“The change process ignores Nutanix restrictions on changing a VLAN ID for an occupied subnet” would imply the change process ignores Nutanix restrictions on changing a VLAN ID for an occupied subnet. The observed fabric issue instead points to the VMM domain targets a virtual switch other than the one used by the application VMs.
Question 448
After the ACI configuration is corrected at fictional Nova Aero, the engineer needs proof that this issue is resolved: A production vCenter contains multiple DVS instances, but the APIC VMM domain is associated with a testing DVS. Which observation is the strongest evidence?
- APIC allocates an eligible VLAN and the port group uses the expected encapsulation.
- The EPG-backed port groups appear on the DVS used by the production VMs.
- The VM keeps the expected EPG connectivity after the selected uplink is disconnected.
- Affected VMs have a planned cutover to the new subnet and both ACI and Nutanix show the desired VLAN.
Explanation
Correct Answer
B:The outcome directly tests the corrected Distributed virtual switch selection behavior. The EPG-backed port groups appear on the DVS used by the production VMs. It provides stronger evidence than a generic green dashboard or link-up check.
Incorrect Answers
A:“APIC allocates an eligible VLAN and the port group uses the expected encapsulation” could verify the VMM domain does not have an eligible encapsulation VLAN in its associated dynamic pool, not the VMM domain targets a virtual switch other than the one used by the application VMs. Confirm instead that the EPG-backed port groups appear on the DVS used by the production VMs.
C:“The VM keeps the expected EPG connectivity after the selected uplink is disconnected” could verify the physical vPC or uplink policy and VMware teaming do not match the supported ACI attachment design, not the VMM domain targets a virtual switch other than the one used by the application VMs. Confirm instead that the EPG-backed port groups appear on the DVS used by the production VMs.
D:“Affected VMs have a planned cutover to the new subnet and both ACI and Nutanix show the desired VLAN” could verify the change process ignores Nutanix restrictions on changing a VLAN ID for an occupied subnet, not the VMM domain targets a virtual switch other than the one used by the application VMs. Confirm instead that the EPG-backed port groups appear on the DVS used by the production VMs.
Question 449
A maintenance standard is being revised after this ACI fault at fictional Nova Aero: A production vCenter contains multiple DVS instances, but the APIC VMM domain is associated with a testing DVS. Which ongoing verification is most relevant?
- Repeat a documented regression test confirming: aPIC allocates an eligible VLAN and the port group uses the expected encapsulation.
- Repeat a documented regression test confirming: the EPG-backed port groups appear on the DVS used by the production VMs.
- Repeat a documented regression test confirming: the VM keeps the expected EPG connectivity after the selected uplink is disconnected.
- Repeat a documented regression test confirming: affected VMs have a planned cutover to the new subnet and both ACI and Nutanix show the desired VLAN.
Explanation
Correct Answer
B:The safeguard focuses on the actual root defect: The VMM domain targets a virtual switch other than the one used by the application VMs. Retesting this outcome can catch a later policy or topology drift.
Incorrect Answers
A:“Repeat a documented regression test confirming: aPIC allocates an eligible VLAN and the port group uses the expected encapsulation” is a regression check for the VMM domain does not have an eligible encapsulation VLAN in its associated dynamic pool. It does not retest the actual failure, the VMM domain targets a virtual switch other than the one used by the application VMs; use the case-specific result “Repeat a documented regression test confirming: the EPG-backed port groups appear on the DVS used by the production VMs”.
C:“Repeat a documented regression test confirming: the VM keeps the expected EPG connectivity after the selected uplink is disconnected” is a regression check for the physical vPC or uplink policy and VMware teaming do not match the supported ACI attachment design. It does not retest the actual failure, the VMM domain targets a virtual switch other than the one used by the application VMs; use the case-specific result “Repeat a documented regression test confirming: the EPG-backed port groups appear on the DVS used by the production VMs”.
D:“Repeat a documented regression test confirming: affected VMs have a planned cutover to the new subnet and both ACI and Nutanix show the desired VLAN” is a regression check for the change process ignores Nutanix restrictions on changing a VLAN ID for an occupied subnet. It does not retest the actual failure, the VMM domain targets a virtual switch other than the one used by the application VMs; use the case-specific result “Repeat a documented regression test confirming: the EPG-backed port groups appear on the DVS used by the production VMs”.
Question 450
During a post-incident review at fictional Nova Aero, the original condition was: A production vCenter contains multiple DVS instances, but the APIC VMM domain is associated with a testing DVS. Which shortcut would leave its cause in place?
- Bind the VM port group to any arbitrary VLAN outside the domain pool.
- Call an unsupported collection of independent switch ports a resilient VMware vPC uplink.
- Force a live occupied Nutanix subnet's VLAN to change in place without migration planning.
- Assume any vCenter DVS can carry a production EPG without matching domain association.
Explanation
Correct Answer
D:Reject it because it defeats the correction for this observed case: A production vCenter contains multiple DVS instances, but the APIC VMM domain is associated with a testing DVS. The required outcome remains: The EPG-backed port groups appear on the DVS used by the production VMs.
Incorrect Answers
A:“Bind the VM port group to any arbitrary VLAN outside the domain pool” represents a different ACI defect involving the VMM domain does not have an eligible encapsulation VLAN in its associated dynamic pool. The shortcut sought here preserves the VMM domain targets a virtual switch other than the one used by the application VMs, so the relevant answer is “Assume any vCenter DVS can carry a production EPG without matching domain association”.
B:“Call an unsupported collection of independent switch ports a resilient VMware vPC uplink” represents a different ACI defect involving the physical vPC or uplink policy and VMware teaming do not match the supported ACI attachment design. The shortcut sought here preserves the VMM domain targets a virtual switch other than the one used by the application VMs, so the relevant answer is “Assume any vCenter DVS can carry a production EPG without matching domain association”.
C:“Force a live occupied Nutanix subnet's VLAN to change in place without migration planning” represents a different ACI defect involving the change process ignores Nutanix restrictions on changing a VLAN ID for an occupied subnet. The shortcut sought here preserves the VMM domain targets a virtual switch other than the one used by the application VMs, so the relevant answer is “Assume any vCenter DVS can carry a production EPG without matching domain association”.