Implementing Cisco Application Centric Infrastructure (DCACI) 300-620 Practice Test 69
Question 680
A change reviewer at fictional Alder Financial sees: An engineer starts a leaf firmware upgrade before confirming the compatible APIC release and upgrade sequence. Which tempting simplification should be rejected?
- Upgrade every leaf independently to an arbitrary version before validating the controller release.
- Treat a critical pre-upgrade fault as a cosmetic warning and upgrade all nodes simultaneously.
- Close the change solely because all switch firmware versions match.
- Rely solely on a tenant bridge domain to replace required OOB APIC management connectivity.
Explanation
Correct Answer
A:This proposal reintroduces the underlying failure: The maintenance plan does not follow supported controller/switch version compatibility and ordering. The supported alternative is: Validate Cisco release guidance and perform the approved APIC/fabric upgrade sequence.
Incorrect Answers
B:“Treat a critical pre-upgrade fault as a cosmetic warning and upgrade all nodes simultaneously” represents a different ACI defect involving the upgrade process has ignored readiness faults that could compromise maintenance reliability. The shortcut sought here preserves the maintenance plan does not follow supported controller/switch version compatibility and ordering, so the relevant answer is “Upgrade every leaf independently to an arbitrary version before validating the controller release”.
C:“Close the change solely because all switch firmware versions match” represents a different ACI defect involving upgrade completion state is being used without application forwarding and health validation. The shortcut sought here preserves the maintenance plan does not follow supported controller/switch version compatibility and ordering, so the relevant answer is “Upgrade every leaf independently to an arbitrary version before validating the controller release”.
D:“Rely solely on a tenant bridge domain to replace required OOB APIC management connectivity” represents a different ACI defect involving the OOB management interface, gateway or external OOB routing is not configured for the approved network. The shortcut sought here preserves the maintenance plan does not follow supported controller/switch version compatibility and ordering, so the relevant answer is “Upgrade every leaf independently to an arbitrary version before validating the controller release”.
Question 681
Engineers at fictional Bluehaven Systems report: A scheduled ACI upgrade begins even though the pre-upgrade health check reports critical fabric faults. Which implementation step should be prioritized?
- Resolve or risk-accept documented blockers and rerun supported pre-upgrade checks.
- Plan supported staggered upgrade groups that preserve required forwarding capacity.
- Pause the rollout, investigate the failed node, and follow the approved recovery or rollback procedure.
- Build the supported in-band management EPG connectivity and authorize the required NOC access.
Explanation
Correct Answer
A:This change matches the observed ACI failure at Bluehaven Systems. Resolve or risk-accept documented blockers and rerun supported pre-upgrade checks. It corrects the underlying issue that the upgrade process has ignored readiness faults that could compromise maintenance reliability.
Incorrect Answers
B:“Plan supported staggered upgrade groups that preserve required forwarding capacity” addresses the upgrade grouping ignores fabric availability and redundancy requirements, but the ACI fault here is the upgrade process has ignored readiness faults that could compromise maintenance reliability. The appropriate implementation is “Resolve or risk-accept documented blockers and rerun supported pre-upgrade checks”.
C:“Pause the rollout, investigate the failed node, and follow the approved recovery or rollback procedure” addresses the upgrade workflow lacks a fault stop condition and rollback or escalation decision point, but the ACI fault here is the upgrade process has ignored readiness faults that could compromise maintenance reliability. The appropriate implementation is “Resolve or risk-accept documented blockers and rerun supported pre-upgrade checks”.
D:“Build the supported in-band management EPG connectivity and authorize the required NOC access” addresses the in-band management EPG and the appropriate management contract or route are not complete, but the ACI fault here is the upgrade process has ignored readiness faults that could compromise maintenance reliability. The appropriate implementation is “Resolve or risk-accept documented blockers and rerun supported pre-upgrade checks”.
Question 682
After checking the symptoms at fictional Bluehaven Systems: A scheduled ACI upgrade begins even though the pre-upgrade health check reports critical fabric faults. Which policy or topology defect is most likely?
- The upgrade grouping ignores fabric availability and redundancy requirements.
- The upgrade process has ignored readiness faults that could compromise maintenance reliability.
- The upgrade workflow lacks a fault stop condition and rollback or escalation decision point.
- The in-band management EPG and the appropriate management contract or route are not complete.
Explanation
Correct Answer
B:This is the implicated mechanism, not just a correlated symptom: The upgrade process has ignored readiness faults that could compromise maintenance reliability. The corrective implementation is to resolve or risk-accept documented blockers and rerun supported pre-upgrade checks.
Incorrect Answers
A:“The upgrade grouping ignores fabric availability and redundancy requirements” would imply the upgrade grouping ignores fabric availability and redundancy requirements. The observed fabric issue instead points to the upgrade process has ignored readiness faults that could compromise maintenance reliability.
C:“The upgrade workflow lacks a fault stop condition and rollback or escalation decision point” would imply the upgrade workflow lacks a fault stop condition and rollback or escalation decision point. The observed fabric issue instead points to the upgrade process has ignored readiness faults that could compromise maintenance reliability.
D:“The in-band management EPG and the appropriate management contract or route are not complete” would imply the in-band management EPG and the appropriate management contract or route are not complete. The observed fabric issue instead points to the upgrade process has ignored readiness faults that could compromise maintenance reliability.
Question 683
After the ACI configuration is corrected at fictional Bluehaven Systems, the engineer needs proof that this issue is resolved: A scheduled ACI upgrade begins even though the pre-upgrade health check reports critical fabric faults. Which observation is the strongest evidence?
- During a rehearsal, at least the required redundant spine and leaf paths remain operational.
- The failed node is recovered or isolated with an approved decision before further upgrades resume.
- The NOC reaches the selected fabric node in-band through the intended policy and path.
- The fabric passes the approved pre-upgrade health gate before installation begins.
Explanation
Correct Answer
D:The needed validation is specific to this defect: The upgrade process has ignored readiness faults that could compromise maintenance reliability. The observation that confirms the repair is: The fabric passes the approved pre-upgrade health gate before installation begins.
Incorrect Answers
A:The observation is appropriate when the upgrade grouping ignores fabric availability and redundancy requirements. The requested sign-off must instead show: The fabric passes the approved pre-upgrade health gate before installation begins.
B:The observation is appropriate when the upgrade workflow lacks a fault stop condition and rollback or escalation decision point. The requested sign-off must instead show: The fabric passes the approved pre-upgrade health gate before installation begins.
C:The observation is appropriate when the in-band management EPG and the appropriate management contract or route are not complete. The requested sign-off must instead show: The fabric passes the approved pre-upgrade health gate before installation begins.
Question 684
A maintenance standard is being revised after this ACI fault at fictional Bluehaven Systems: A scheduled ACI upgrade begins even though the pre-upgrade health check reports critical fabric faults. Which ongoing verification is most relevant?
- Repeat a documented regression test confirming: during a rehearsal, at least the required redundant spine and leaf paths remain operational.
- Repeat a documented regression test confirming: the failed node is recovered or isolated with an approved decision before further upgrades resume.
- Repeat a documented regression test confirming: the NOC reaches the selected fabric node in-band through the intended policy and path.
- Repeat a documented regression test confirming: the fabric passes the approved pre-upgrade health gate before installation begins.
Explanation
Correct Answer
D:A scheduled check should confirm that the fabric passes the approved pre-upgrade health gate before installation begins. This helps show the corrected policy relationship remains healthy after future changes.
Incorrect Answers
A:“Repeat a documented regression test confirming: during a rehearsal, at least the required redundant spine and leaf paths remain operational” is a regression check for the upgrade grouping ignores fabric availability and redundancy requirements. It does not retest the actual failure, the upgrade process has ignored readiness faults that could compromise maintenance reliability; use the case-specific result “Repeat a documented regression test confirming: the fabric passes the approved pre-upgrade health gate before installation begins”.
B:“Repeat a documented regression test confirming: the failed node is recovered or isolated with an approved decision before further upgrades resume” is a regression check for the upgrade workflow lacks a fault stop condition and rollback or escalation decision point. It does not retest the actual failure, the upgrade process has ignored readiness faults that could compromise maintenance reliability; use the case-specific result “Repeat a documented regression test confirming: the fabric passes the approved pre-upgrade health gate before installation begins”.
C:“Repeat a documented regression test confirming: the NOC reaches the selected fabric node in-band through the intended policy and path” is a regression check for the in-band management EPG and the appropriate management contract or route are not complete. It does not retest the actual failure, the upgrade process has ignored readiness faults that could compromise maintenance reliability; use the case-specific result “Repeat a documented regression test confirming: the fabric passes the approved pre-upgrade health gate before installation begins”.
Question 685
During a post-incident review at fictional Bluehaven Systems, the original condition was: A scheduled ACI upgrade begins even though the pre-upgrade health check reports critical fabric faults. Which shortcut would leave its cause in place?
- Upgrade all fabric spines simultaneously because APIC controllers remain powered on.
- Continue upgrading every remaining leaf while the first member is unavailable.
- Assume defining a tenant VRF alone grants administrator access to fabric interfaces.
- Treat a critical pre-upgrade fault as a cosmetic warning and upgrade all nodes simultaneously.
Explanation
Correct Answer
D:The proposed shortcut would preserve the wrong assumption at Bluehaven Systems. The team should instead implement: Resolve or risk-accept documented blockers and rerun supported pre-upgrade checks.
Incorrect Answers
A:“Upgrade all fabric spines simultaneously because APIC controllers remain powered on” represents a different ACI defect involving the upgrade grouping ignores fabric availability and redundancy requirements. The shortcut sought here preserves the upgrade process has ignored readiness faults that could compromise maintenance reliability, so the relevant answer is “Treat a critical pre-upgrade fault as a cosmetic warning and upgrade all nodes simultaneously”.
B:“Continue upgrading every remaining leaf while the first member is unavailable” represents a different ACI defect involving the upgrade workflow lacks a fault stop condition and rollback or escalation decision point. The shortcut sought here preserves the upgrade process has ignored readiness faults that could compromise maintenance reliability, so the relevant answer is “Treat a critical pre-upgrade fault as a cosmetic warning and upgrade all nodes simultaneously”.
C:“Assume defining a tenant VRF alone grants administrator access to fabric interfaces” represents a different ACI defect involving the in-band management EPG and the appropriate management contract or route are not complete. The shortcut sought here preserves the upgrade process has ignored readiness faults that could compromise maintenance reliability, so the relevant answer is “Treat a critical pre-upgrade fault as a cosmetic warning and upgrade all nodes simultaneously”.
Question 686
During a data center change at fictional Lighthouse Legal, the following issue occurs: All spines are selected for concurrent firmware maintenance, threatening all leaf-to-spine connectivity. What targeted correction should the engineer select?
- Import and assign the supported firmware image matching the target platform and release.
- Correct the management DNS record and resolver reachability without modifying tenant EPG routing.
- Restrict the management EPG and contracts to designated jump hosts and required protocols.
- Plan supported staggered upgrade groups that preserve required forwarding capacity.
Explanation
Correct Answer
D:This change matches the observed ACI failure at Lighthouse Legal. Plan supported staggered upgrade groups that preserve required forwarding capacity. It corrects the underlying issue that the upgrade grouping ignores fabric availability and redundancy requirements.
Incorrect Answers
A:“Import and assign the supported firmware image matching the target platform and release” addresses the selected firmware image is not compatible with the targeted ACI nodes, but the ACI fault here is the upgrade grouping ignores fabric availability and redundancy requirements. The appropriate implementation is “Plan supported staggered upgrade groups that preserve required forwarding capacity”.
B:“Correct the management DNS record and resolver reachability without modifying tenant EPG routing” addresses the management DNS records or resolver path were not updated for the new address, but the ACI fault here is the upgrade grouping ignores fabric availability and redundancy requirements. The appropriate implementation is “Plan supported staggered upgrade groups that preserve required forwarding capacity”.
C:“Restrict the management EPG and contracts to designated jump hosts and required protocols” addresses the management access policy has been scoped more widely than the approved operational source network, but the ACI fault here is the upgrade grouping ignores fabric availability and redundancy requirements. The appropriate implementation is “Plan supported staggered upgrade groups that preserve required forwarding capacity”.
Question 687
During a Cisco ACI troubleshooting review at fictional Lighthouse Legal, the team finds: All spines are selected for concurrent firmware maintenance, threatening all leaf-to-spine connectivity. Which design or configuration mistake best accounts for the observation?
- The selected firmware image is not compatible with the targeted ACI nodes.
- The management DNS records or resolver path were not updated for the new address.
- The upgrade grouping ignores fabric availability and redundancy requirements.
- The management access policy has been scoped more widely than the approved operational source network.
Explanation
Correct Answer
C:This is the implicated mechanism, not just a correlated symptom: The upgrade grouping ignores fabric availability and redundancy requirements. The corrective implementation is to plan supported staggered upgrade groups that preserve required forwarding capacity.
Incorrect Answers
A:“The selected firmware image is not compatible with the targeted ACI nodes” would imply the selected firmware image is not compatible with the targeted ACI nodes. The observed fabric issue instead points to the upgrade grouping ignores fabric availability and redundancy requirements.
B:“The management DNS records or resolver path were not updated for the new address” would imply the management DNS records or resolver path were not updated for the new address. The observed fabric issue instead points to the upgrade grouping ignores fabric availability and redundancy requirements.
D:“The management access policy has been scoped more widely than the approved operational source network” would imply the management access policy has been scoped more widely than the approved operational source network. The observed fabric issue instead points to the upgrade grouping ignores fabric availability and redundancy requirements.
Question 688
A change-validation meeting at fictional Lighthouse Legal reviews this issue: All spines are selected for concurrent firmware maintenance, threatening all leaf-to-spine connectivity. Which test outcome should be required for sign-off?
- The correct image is validated and accepted for the intended node upgrade group.
- The intended management FQDN resolves to the correct APIC address from the NOC.
- Authorized jump hosts manage APIC while ordinary workstation subnets cannot access privileged ports.
- During a rehearsal, at least the required redundant spine and leaf paths remain operational.
Explanation
Correct Answer
D:The needed validation is specific to this defect: The upgrade grouping ignores fabric availability and redundancy requirements. The observation that confirms the repair is: During a rehearsal, at least the required redundant spine and leaf paths remain operational.
Incorrect Answers
A:The observation is appropriate when the selected firmware image is not compatible with the targeted ACI nodes. The requested sign-off must instead show: During a rehearsal, at least the required redundant spine and leaf paths remain operational.
B:The observation is appropriate when the management DNS records or resolver path were not updated for the new address. The requested sign-off must instead show: During a rehearsal, at least the required redundant spine and leaf paths remain operational.
C:The observation is appropriate when the management access policy has been scoped more widely than the approved operational source network. The requested sign-off must instead show: During a rehearsal, at least the required redundant spine and leaf paths remain operational.
Question 689
The operations team at fictional Lighthouse Legal wants to detect recurrence of: All spines are selected for concurrent firmware maintenance, threatening all leaf-to-spine connectivity. Which repeatable control should be adopted?
- Repeat a documented regression test confirming: the correct image is validated and accepted for the intended node upgrade group.
- Repeat a documented regression test confirming: the intended management FQDN resolves to the correct APIC address from the NOC.
- Repeat a documented regression test confirming: authorized jump hosts manage APIC while ordinary workstation subnets cannot access privileged ports.
- Repeat a documented regression test confirming: during a rehearsal, at least the required redundant spine and leaf paths remain operational.
Explanation
Correct Answer
D:A scheduled check should confirm that during a rehearsal, at least the required redundant spine and leaf paths remain operational. This helps show the corrected policy relationship remains healthy after future changes.
Incorrect Answers
A:“Repeat a documented regression test confirming: the correct image is validated and accepted for the intended node upgrade group” is a regression check for the selected firmware image is not compatible with the targeted ACI nodes. It does not retest the actual failure, the upgrade grouping ignores fabric availability and redundancy requirements; use the case-specific result “Repeat a documented regression test confirming: during a rehearsal, at least the required redundant spine and leaf paths remain operational”.
B:“Repeat a documented regression test confirming: the intended management FQDN resolves to the correct APIC address from the NOC” is a regression check for the management DNS records or resolver path were not updated for the new address. It does not retest the actual failure, the upgrade grouping ignores fabric availability and redundancy requirements; use the case-specific result “Repeat a documented regression test confirming: during a rehearsal, at least the required redundant spine and leaf paths remain operational”.
C:“Repeat a documented regression test confirming: authorized jump hosts manage APIC while ordinary workstation subnets cannot access privileged ports” is a regression check for the management access policy has been scoped more widely than the approved operational source network. It does not retest the actual failure, the upgrade grouping ignores fabric availability and redundancy requirements; use the case-specific result “Repeat a documented regression test confirming: during a rehearsal, at least the required redundant spine and leaf paths remain operational”.
Question 690
Engineers at fictional Lighthouse Legal want to avoid repeating: All spines are selected for concurrent firmware maintenance, threatening all leaf-to-spine connectivity. Which proposed action is unsafe for this specific reason?
- Force a package built for a different hardware family onto the target leaf.
- Change tenant VRF contracts to fix a missing external management DNS record.
- Use 0.0.0.0/0 in all management allow rules to simplify operations.
- Upgrade all fabric spines simultaneously because APIC controllers remain powered on.
Explanation
Correct Answer
D:The proposed shortcut would preserve the wrong assumption at Lighthouse Legal. The team should instead implement: Plan supported staggered upgrade groups that preserve required forwarding capacity.
Incorrect Answers
A:“Force a package built for a different hardware family onto the target leaf” represents a different ACI defect involving the selected firmware image is not compatible with the targeted ACI nodes. The shortcut sought here preserves the upgrade grouping ignores fabric availability and redundancy requirements, so the relevant answer is “Upgrade all fabric spines simultaneously because APIC controllers remain powered on”.
B:“Change tenant VRF contracts to fix a missing external management DNS record” represents a different ACI defect involving the management DNS records or resolver path were not updated for the new address. The shortcut sought here preserves the upgrade grouping ignores fabric availability and redundancy requirements, so the relevant answer is “Upgrade all fabric spines simultaneously because APIC controllers remain powered on”.
C:“Use 0.0.0.0/0 in all management allow rules to simplify operations” represents a different ACI defect involving the management access policy has been scoped more widely than the approved operational source network. The shortcut sought here preserves the upgrade grouping ignores fabric availability and redundancy requirements, so the relevant answer is “Upgrade all fabric spines simultaneously because APIC controllers remain powered on”.