Implementing Cisco Application Centric Infrastructure (DCACI) 300-620 Practice Test 77
Question 760
During a post-incident review at fictional Nova Aero, the original condition was: Two ACI sites must share selected tenant contracts, but their independent APIC policies drift with manual duplicate edits. Which shortcut would leave its cause in place?
- Rely on the existence of an NDO template to create physical WAN underlay routes.
- Power off all site controllers to simulate one fabric's APIC failure without planning impact.
- Edit only one site's local APIC and assume the changes automatically propagate to all sites.
- Install an unrelated controller cluster per pod and assume that alone creates a single Multi-Pod fabric.
Explanation
Correct Answer
C:The proposed shortcut would preserve the wrong assumption at Nova Aero. The team should instead implement: Use Nexus Dashboard Orchestrator to govern approved site templates and deploy policy to the intended fabrics.
Incorrect Answers
A:“Rely on the existence of an NDO template to create physical WAN underlay routes” represents a different ACI defect involving the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. The shortcut sought here preserves the intersite governance process lacks a supported shared policy orchestration workflow, so the relevant answer is “Edit only one site's local APIC and assume the changes automatically propagate to all sites”.
B:“Power off all site controllers to simulate one fabric's APIC failure without planning impact” represents a different ACI defect involving the team confuses independent site-level control planes with a single Multi-Pod APIC cluster. The shortcut sought here preserves the intersite governance process lacks a supported shared policy orchestration workflow, so the relevant answer is “Edit only one site's local APIC and assume the changes automatically propagate to all sites”.
D:“Install an unrelated controller cluster per pod and assume that alone creates a single Multi-Pod fabric” represents a different ACI defect involving the deployment confuses one distributed fabric managed by a single APIC cluster with independent Multi-Site fabrics. The shortcut sought here preserves the intersite governance process lacks a supported shared policy orchestration workflow, so the relevant answer is “Edit only one site's local APIC and assume the changes automatically propagate to all sites”.
Question 761
During a data center change at fictional Cedar Health, the following issue occurs: Sites managed under a common NDO template cannot exchange approved application traffic because the intersite transport routing is incomplete. What targeted correction should the engineer select?
- Validate the Multi-Site intersite routed network and its control/data-plane prerequisites.
- Associate and deploy the supported NDO template to each intended site and check deployment status.
- Use supported Remote Leaf architecture to attach remote leaves to the parent fabric over the approved transport.
- Verify the supported Multi-Pod IPN routing, addressing, MTU and connectivity prerequisites.
Explanation
Correct Answer
A:The reported condition follows because the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. The selected action repairs that policy or forwarding relationship. A meaningful acceptance check is: Cross-site application flows use the documented overlay path with healthy intersite connectivity.
Incorrect Answers
B:“Associate and deploy the supported NDO template to each intended site and check deployment status” addresses the orchestrator's template-to-site association does not include the required target site, but the ACI fault here is the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. The appropriate implementation is “Validate the Multi-Site intersite routed network and its control/data-plane prerequisites”.
C:“Use supported Remote Leaf architecture to attach remote leaves to the parent fabric over the approved transport” addresses the Remote Leaf extension model is being confused with a complete additional ACI pod, but the ACI fault here is the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. The appropriate implementation is “Validate the Multi-Site intersite routed network and its control/data-plane prerequisites”.
D:“Verify the supported Multi-Pod IPN routing, addressing, MTU and connectivity prerequisites” addresses the Inter-Pod Network does not meet the required routed connectivity between the pods' infrastructure endpoints, but the ACI fault here is the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. The appropriate implementation is “Validate the Multi-Site intersite routed network and its control/data-plane prerequisites”.
Question 762
During a Cisco ACI troubleshooting review at fictional Cedar Health, the team finds: Sites managed under a common NDO template cannot exchange approved application traffic because the intersite transport routing is incomplete. Which design or configuration mistake best accounts for the observation?
- The orchestrator's template-to-site association does not include the required target site.
- The Remote Leaf extension model is being confused with a complete additional ACI pod.
- The site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange.
- The Inter-Pod Network does not meet the required routed connectivity between the pods' infrastructure endpoints.
Explanation
Correct Answer
C:At Cedar Health, the problem is not solved by unrelated EPG changes. The site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. The correct follow-up is: Validate the Multi-Site intersite routed network and its control/data-plane prerequisites.
Incorrect Answers
A:The alternative diagnosis concerns Multi-Site deployment targeting. Here the distinguishing issue is: The site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange.
B:The alternative diagnosis concerns Remote Leaf topology. Here the distinguishing issue is: The site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange.
D:The alternative diagnosis concerns Multi-Pod IPN reachability. Here the distinguishing issue is: The site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange.
Question 763
A change-validation meeting at fictional Cedar Health reviews this issue: Sites managed under a common NDO template cannot exchange approved application traffic because the intersite transport routing is incomplete. Which test outcome should be required for sign-off?
- The required application objects appear on both targeted sites with the correct site assignments.
- The remote leaf registers under the intended fabric and uses the validated remote connectivity without local spine deployment.
- Traffic between the pods follows the intended IPN while local pod forwarding remains stable.
- Cross-site application flows use the documented overlay path with healthy intersite connectivity.
Explanation
Correct Answer
D:For sign-off, the engineer must see the expected result: Cross-site application flows use the documented overlay path with healthy intersite connectivity. That demonstrates the targeted Multi-Site intersite network behavior is functioning.
Incorrect Answers
A:“The required application objects appear on both targeted sites with the correct site assignments” could verify the orchestrator's template-to-site association does not include the required target site, not the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. Confirm instead that cross-site application flows use the documented overlay path with healthy intersite connectivity.
B:“The remote leaf registers under the intended fabric and uses the validated remote connectivity without local spine deployment” could verify the Remote Leaf extension model is being confused with a complete additional ACI pod, not the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. Confirm instead that cross-site application flows use the documented overlay path with healthy intersite connectivity.
C:“Traffic between the pods follows the intended IPN while local pod forwarding remains stable” could verify the Inter-Pod Network does not meet the required routed connectivity between the pods' infrastructure endpoints, not the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange. Confirm instead that cross-site application flows use the documented overlay path with healthy intersite connectivity.
Question 764
The operations team at fictional Cedar Health wants to detect recurrence of: Sites managed under a common NDO template cannot exchange approved application traffic because the intersite transport routing is incomplete. Which repeatable control should be adopted?
- Repeat a documented regression test confirming: the required application objects appear on both targeted sites with the correct site assignments.
- Repeat a documented regression test confirming: cross-site application flows use the documented overlay path with healthy intersite connectivity.
- Repeat a documented regression test confirming: the remote leaf registers under the intended fabric and uses the validated remote connectivity without local spine deployment.
- Repeat a documented regression test confirming: traffic between the pods follows the intended IPN while local pod forwarding remains stable.
Explanation
Correct Answer
B:This repeating check can reveal regression of the Multi-Site intersite network control because it verifies: Cross-site application flows use the documented overlay path with healthy intersite connectivity. It tests the original failure condition, not general fabric availability.
Incorrect Answers
A:That recurring check is useful for Multi-Site deployment targeting, not for detecting the current Multi-Site intersite network regression. The desired recurring result is: Cross-site application flows use the documented overlay path with healthy intersite connectivity.
C:That recurring check is useful for Remote Leaf topology, not for detecting the current Multi-Site intersite network regression. The desired recurring result is: Cross-site application flows use the documented overlay path with healthy intersite connectivity.
D:That recurring check is useful for Multi-Pod IPN reachability, not for detecting the current Multi-Site intersite network regression. The desired recurring result is: Cross-site application flows use the documented overlay path with healthy intersite connectivity.
Question 765
Engineers at fictional Cedar Health want to avoid repeating: Sites managed under a common NDO template cannot exchange approved application traffic because the intersite transport routing is incomplete. Which proposed action is unsafe for this specific reason?
- Assume editing an NDO schema deploys it immediately to every registered site without selection.
- Rely on the existence of an NDO template to create physical WAN underlay routes.
- Install a new spine-and-controller fabric at every Remote Leaf office by definition.
- Connect the two pod fabrics with an arbitrary tenant access VLAN instead of a validated IPN.
Explanation
Correct Answer
B:That shortcut contradicts the intended Multi-Site intersite network implementation. The safer response is to validate the Multi-Site intersite routed network and its control/data-plane prerequisites.
Incorrect Answers
A:“Assume editing an NDO schema deploys it immediately to every registered site without selection” represents a different ACI defect involving the orchestrator's template-to-site association does not include the required target site. The shortcut sought here preserves the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange, so the relevant answer is “Rely on the existence of an NDO template to create physical WAN underlay routes”.
C:“Install a new spine-and-controller fabric at every Remote Leaf office by definition” represents a different ACI defect involving the Remote Leaf extension model is being confused with a complete additional ACI pod. The shortcut sought here preserves the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange, so the relevant answer is “Rely on the existence of an NDO template to create physical WAN underlay routes”.
D:“Connect the two pod fabrics with an arbitrary tenant access VLAN instead of a validated IPN” represents a different ACI defect involving the Inter-Pod Network does not meet the required routed connectivity between the pods' infrastructure endpoints. The shortcut sought here preserves the site connectivity design omits supported underlay reachability needed for Multi-Site overlay exchange, so the relevant answer is “Rely on the existence of an NDO template to create physical WAN underlay routes”.
Question 766
At fictional Falcon University (research computing), the ACI operations team observes: A global policy template intended for two sites is associated with only one, leaving the second site's application EPG absent. Which change most directly addresses the issue?
- Define ownership boundaries between NDO-governed objects and site-local APIC policy before deployment.
- Associate and deploy the supported NDO template to each intended site and check deployment status.
- Check supported Remote Leaf transport addressing, route and MTU requirements and restore the parent-fabric path.
- Allocate the correct unique pod identifier and validate node-to-pod registration.
Explanation
Correct Answer
B:The reported condition follows because the orchestrator's template-to-site association does not include the required target site. The selected action repairs that policy or forwarding relationship. A meaningful acceptance check is: The required application objects appear on both targeted sites with the correct site assignments.
Incorrect Answers
A:“Define ownership boundaries between NDO-governed objects and site-local APIC policy before deployment” addresses the design does not distinguish orchestrator-owned global policy from approved local site configuration, but the ACI fault here is the orchestrator's template-to-site association does not include the required target site. The appropriate implementation is “Associate and deploy the supported NDO template to each intended site and check deployment status”.
C:“Check supported Remote Leaf transport addressing, route and MTU requirements and restore the parent-fabric path” addresses the remote transport path no longer meets the required infrastructure reachability for Remote Leaf connectivity, but the ACI fault here is the orchestrator's template-to-site association does not include the required target site. The appropriate implementation is “Associate and deploy the supported NDO template to each intended site and check deployment status”.
D:“Allocate the correct unique pod identifier and validate node-to-pod registration” addresses the Multi-Pod deployment has conflicting fabric pod identities, but the ACI fault here is the orchestrator's template-to-site association does not include the required target site. The appropriate implementation is “Associate and deploy the supported NDO template to each intended site and check deployment status”.
Question 767
The network incident record for fictional Falcon University states: A global policy template intended for two sites is associated with only one, leaving the second site's application EPG absent. What underlying fault should the engineer investigate first?
- The design does not distinguish orchestrator-owned global policy from approved local site configuration.
- The remote transport path no longer meets the required infrastructure reachability for Remote Leaf connectivity.
- The orchestrator's template-to-site association does not include the required target site.
- The Multi-Pod deployment has conflicting fabric pod identities.
Explanation
Correct Answer
C:At Falcon University, the problem is not solved by unrelated EPG changes. The orchestrator's template-to-site association does not include the required target site. The correct follow-up is: Associate and deploy the supported NDO template to each intended site and check deployment status.
Incorrect Answers
A:The alternative diagnosis concerns Site-local policy boundaries. Here the distinguishing issue is: The orchestrator's template-to-site association does not include the required target site.
B:The alternative diagnosis concerns Remote Leaf WAN reachability. Here the distinguishing issue is: The orchestrator's template-to-site association does not include the required target site.
D:The alternative diagnosis concerns Multi-Pod pod identifiers. Here the distinguishing issue is: The orchestrator's template-to-site association does not include the required target site.
Question 768
The network lead at fictional Falcon University is validating remediation of: A global policy template intended for two sites is associated with only one, leaving the second site's application EPG absent. Which result confirms the specific fix?
- Shared policy is consistent without overwriting the independently governed local maintenance EPG.
- The remote leaf becomes a healthy managed node and approved endpoints can reach required fabric services.
- The required application objects appear on both targeted sites with the correct site assignments.
- All nodes show their intended unique pod membership without identity collisions.
Explanation
Correct Answer
C:For sign-off, the engineer must see the expected result: The required application objects appear on both targeted sites with the correct site assignments. That demonstrates the targeted Multi-Site deployment targeting behavior is functioning.
Incorrect Answers
A:“Shared policy is consistent without overwriting the independently governed local maintenance EPG” could verify the design does not distinguish orchestrator-owned global policy from approved local site configuration, not the orchestrator's template-to-site association does not include the required target site. Confirm instead that the required application objects appear on both targeted sites with the correct site assignments.
B:“The remote leaf becomes a healthy managed node and approved endpoints can reach required fabric services” could verify the remote transport path no longer meets the required infrastructure reachability for Remote Leaf connectivity, not the orchestrator's template-to-site association does not include the required target site. Confirm instead that the required application objects appear on both targeted sites with the correct site assignments.
D:“All nodes show their intended unique pod membership without identity collisions” could verify the Multi-Pod deployment has conflicting fabric pod identities, not the orchestrator's template-to-site association does not include the required target site. Confirm instead that the required application objects appear on both targeted sites with the correct site assignments.
Question 769
After correcting this issue at fictional Falcon University: A global policy template intended for two sites is associated with only one, leaving the second site's application EPG absent. Which scheduled check best protects the corrected design?
- Repeat a documented regression test confirming: shared policy is consistent without overwriting the independently governed local maintenance EPG.
- Repeat a documented regression test confirming: the required application objects appear on both targeted sites with the correct site assignments.
- Repeat a documented regression test confirming: the remote leaf becomes a healthy managed node and approved endpoints can reach required fabric services.
- Repeat a documented regression test confirming: all nodes show their intended unique pod membership without identity collisions.
Explanation
Correct Answer
B:This repeating check can reveal regression of the Multi-Site deployment targeting control because it verifies: The required application objects appear on both targeted sites with the correct site assignments. It tests the original failure condition, not general fabric availability.
Incorrect Answers
A:That recurring check is useful for Site-local policy boundaries, not for detecting the current Multi-Site deployment targeting regression. The desired recurring result is: The required application objects appear on both targeted sites with the correct site assignments.
C:That recurring check is useful for Remote Leaf WAN reachability, not for detecting the current Multi-Site deployment targeting regression. The desired recurring result is: The required application objects appear on both targeted sites with the correct site assignments.
D:That recurring check is useful for Multi-Pod pod identifiers, not for detecting the current Multi-Site deployment targeting regression. The desired recurring result is: The required application objects appear on both targeted sites with the correct site assignments.
Question 770
At fictional Falcon University, the team is reviewing shortcuts for the following ACI issue: A global policy template intended for two sites is associated with only one, leaving the second site's application EPG absent. Which proposal would recreate the same failure?
- Assume editing an NDO schema deploys it immediately to every registered site without selection.
- Treat every site-local object as disposable whenever a global schema is synchronized.
- Assume any internet connection provides the same Remote Leaf infrastructure transport guarantees.
- Reuse the first pod's ID because the second pod is in another building.
Explanation
Correct Answer
A:That shortcut contradicts the intended Multi-Site deployment targeting implementation. The safer response is to associate and deploy the supported NDO template to each intended site and check deployment status.
Incorrect Answers
B:“Treat every site-local object as disposable whenever a global schema is synchronized” represents a different ACI defect involving the design does not distinguish orchestrator-owned global policy from approved local site configuration. The shortcut sought here preserves the orchestrator's template-to-site association does not include the required target site, so the relevant answer is “Assume editing an NDO schema deploys it immediately to every registered site without selection”.
C:“Assume any internet connection provides the same Remote Leaf infrastructure transport guarantees” represents a different ACI defect involving the remote transport path no longer meets the required infrastructure reachability for Remote Leaf connectivity. The shortcut sought here preserves the orchestrator's template-to-site association does not include the required target site, so the relevant answer is “Assume editing an NDO schema deploys it immediately to every registered site without selection”.
D:“Reuse the first pod's ID because the second pod is in another building” represents a different ACI defect involving the Multi-Pod deployment has conflicting fabric pod identities. The shortcut sought here preserves the orchestrator's template-to-site association does not include the required target site, so the relevant answer is “Assume editing an NDO schema deploys it immediately to every registered site without selection”.