Implementing Cisco Application Centric Infrastructure (DCACI) 300-620 Practice Test 42
Question 410
A change reviewer at fictional Kestrel Cloud sees: Two external EPGs have overlapping prefixes and traffic matches a broader unintended external policy. Which tempting simplification should be rejected?
- Increase the OSPF hello interval rather than fixing different connected subnets.
- Treat an APIC cluster member as a substitute for redundant border routing links.
- Treat unrelated interfaces as one LACP bundle solely because their VLAN tags match.
- Use overlapping any-source external subnets and assume the most restrictive contract always wins.
Explanation
Correct Answer
D:That shortcut contradicts the intended External EPG subnet specificity implementation. The safer response is to correct the overlapping external EPG subnet definitions and verify effective classification.
Incorrect Answers
A:“Increase the OSPF hello interval rather than fixing different connected subnets” represents a different ACI defect involving the connected interface addressing does not permit adjacency or next-hop resolution. The shortcut sought here preserves the external classification boundaries do not represent the intended network access groups, so the relevant answer is “Use overlapping any-source external subnets and assume the most restrictive contract always wins”.
B:“Treat an APIC cluster member as a substitute for redundant border routing links” represents a different ACI defect involving the external routing design has not provided validated redundant border connectivity. The shortcut sought here preserves the external classification boundaries do not represent the intended network access groups, so the relevant answer is “Use overlapping any-source external subnets and assume the most restrictive contract always wins”.
C:“Treat unrelated interfaces as one LACP bundle solely because their VLAN tags match” represents a different ACI defect involving the physical connection and EPG path policies do not implement the required port-channel relationship. The shortcut sought here preserves the external classification boundaries do not represent the intended network access groups, so the relevant answer is “Use overlapping any-source external subnets and assume the most restrictive contract always wins”.
Question 411
Engineers at fictional Summit Retail report: A router and ACI border-leaf L3Out interface are placed in different point-to-point subnets by mistake. Which implementation step should be prioritized?
- Correct the L3Out IP address and prefix-length pairing on the approved interface.
- Validate the supported link and protocol MTU parameters on both ends and align them.
- Update the static EPG port binding to the new leaf interface and retain the approved VLAN domain.
- Review STP boundary practices and supported ACI L2 integration loop protection before reconnecting redundant links.
Explanation
Correct Answer
A:The reported condition follows because the connected interface addressing does not permit adjacency or next-hop resolution. The selected action repairs that policy or forwarding relationship. A meaningful acceptance check is: Both ends resolve each other as directly reachable peers and routing adjacency can form.
Incorrect Answers
B:“Validate the supported link and protocol MTU parameters on both ends and align them” addresses the border leaf and external router do not share the required transport MTU assumptions, but the ACI fault here is the connected interface addressing does not permit adjacency or next-hop resolution. The appropriate implementation is “Correct the L3Out IP address and prefix-length pairing on the approved interface”.
C:“Update the static EPG port binding to the new leaf interface and retain the approved VLAN domain” addresses the external Layer 2 binding no longer matches the physical port after the move, but the ACI fault here is the connected interface addressing does not permit adjacency or next-hop resolution. The appropriate implementation is “Correct the L3Out IP address and prefix-length pairing on the approved interface”.
D:“Review STP boundary practices and supported ACI L2 integration loop protection before reconnecting redundant links” addresses external switching loop-prevention behavior was not coordinated with the ACI attachment design, but the ACI fault here is the connected interface addressing does not permit adjacency or next-hop resolution. The appropriate implementation is “Correct the L3Out IP address and prefix-length pairing on the approved interface”.
Question 412
After checking the symptoms at fictional Summit Retail: A router and ACI border-leaf L3Out interface are placed in different point-to-point subnets by mistake. Which policy or topology defect is most likely?
- The connected interface addressing does not permit adjacency or next-hop resolution.
- The border leaf and external router do not share the required transport MTU assumptions.
- The external Layer 2 binding no longer matches the physical port after the move.
- External switching loop-prevention behavior was not coordinated with the ACI attachment design.
Explanation
Correct Answer
A:At Summit Retail, the problem is not solved by unrelated EPG changes. The connected interface addressing does not permit adjacency or next-hop resolution. The correct follow-up is: Correct the L3Out IP address and prefix-length pairing on the approved interface.
Incorrect Answers
B:The alternative diagnosis concerns Border leaf link MTU. Here the distinguishing issue is: The connected interface addressing does not permit adjacency or next-hop resolution.
C:The alternative diagnosis concerns Layer 2 external port move. Here the distinguishing issue is: The connected interface addressing does not permit adjacency or next-hop resolution.
D:The alternative diagnosis concerns STP interoperation. Here the distinguishing issue is: The connected interface addressing does not permit adjacency or next-hop resolution.
Question 413
After the ACI configuration is corrected at fictional Summit Retail, the engineer needs proof that this issue is resolved: A router and ACI border-leaf L3Out interface are placed in different point-to-point subnets by mistake. Which observation is the strongest evidence?
- The intended routing adjacency remains stable and representative packets pass at the approved MTU.
- The migrated external MAC is learned on the new attachment and the old binding is cleared.
- Both ends resolve each other as directly reachable peers and routing adjacency can form.
- No external STP loop occurs during a controlled redundant-path test and ACI faults remain clear.
Explanation
Correct Answer
C:For sign-off, the engineer must see the expected result: Both ends resolve each other as directly reachable peers and routing adjacency can form. That demonstrates the targeted L3Out address mismatch behavior is functioning.
Incorrect Answers
A:“The intended routing adjacency remains stable and representative packets pass at the approved MTU” could verify the border leaf and external router do not share the required transport MTU assumptions, not the connected interface addressing does not permit adjacency or next-hop resolution. Confirm instead that both ends resolve each other as directly reachable peers and routing adjacency can form.
B:“The migrated external MAC is learned on the new attachment and the old binding is cleared” could verify the external Layer 2 binding no longer matches the physical port after the move, not the connected interface addressing does not permit adjacency or next-hop resolution. Confirm instead that both ends resolve each other as directly reachable peers and routing adjacency can form.
D:“No external STP loop occurs during a controlled redundant-path test and ACI faults remain clear” could verify external switching loop-prevention behavior was not coordinated with the ACI attachment design, not the connected interface addressing does not permit adjacency or next-hop resolution. Confirm instead that both ends resolve each other as directly reachable peers and routing adjacency can form.
Question 414
A maintenance standard is being revised after this ACI fault at fictional Summit Retail: A router and ACI border-leaf L3Out interface are placed in different point-to-point subnets by mistake. Which ongoing verification is most relevant?
- Repeat a documented regression test confirming: both ends resolve each other as directly reachable peers and routing adjacency can form.
- Repeat a documented regression test confirming: the intended routing adjacency remains stable and representative packets pass at the approved MTU.
- Repeat a documented regression test confirming: the migrated external MAC is learned on the new attachment and the old binding is cleared.
- Repeat a documented regression test confirming: no external STP loop occurs during a controlled redundant-path test and ACI faults remain clear.
Explanation
Correct Answer
A:This repeating check can reveal regression of the L3Out address mismatch control because it verifies: Both ends resolve each other as directly reachable peers and routing adjacency can form. It tests the original failure condition, not general fabric availability.
Incorrect Answers
B:“Repeat a documented regression test confirming: the intended routing adjacency remains stable and representative packets pass at the approved MTU” is a regression check for the border leaf and external router do not share the required transport MTU assumptions. It does not retest the actual failure, the connected interface addressing does not permit adjacency or next-hop resolution; use the case-specific result “Repeat a documented regression test confirming: both ends resolve each other as directly reachable peers and routing adjacency can form”.
C:“Repeat a documented regression test confirming: the migrated external MAC is learned on the new attachment and the old binding is cleared” is a regression check for the external Layer 2 binding no longer matches the physical port after the move. It does not retest the actual failure, the connected interface addressing does not permit adjacency or next-hop resolution; use the case-specific result “Repeat a documented regression test confirming: both ends resolve each other as directly reachable peers and routing adjacency can form”.
D:“Repeat a documented regression test confirming: no external STP loop occurs during a controlled redundant-path test and ACI faults remain clear” is a regression check for external switching loop-prevention behavior was not coordinated with the ACI attachment design. It does not retest the actual failure, the connected interface addressing does not permit adjacency or next-hop resolution; use the case-specific result “Repeat a documented regression test confirming: both ends resolve each other as directly reachable peers and routing adjacency can form”.
Question 415
During a post-incident review at fictional Summit Retail, the original condition was: A router and ACI border-leaf L3Out interface are placed in different point-to-point subnets by mistake. Which shortcut would leave its cause in place?
- Ignore recurring OSPF adjacency resets and declare the fabric healthy from link state alone.
- Troubleshoot BGP route export on a Layer 2 connection whose static path points to the wrong port.
- Ignore external spanning tree because ACI itself uses a spine-and-leaf topology.
- Increase the OSPF hello interval rather than fixing different connected subnets.
Explanation
Correct Answer
D:That shortcut contradicts the intended L3Out address mismatch implementation. The safer response is to correct the L3Out IP address and prefix-length pairing on the approved interface.
Incorrect Answers
A:“Ignore recurring OSPF adjacency resets and declare the fabric healthy from link state alone” represents a different ACI defect involving the border leaf and external router do not share the required transport MTU assumptions. The shortcut sought here preserves the connected interface addressing does not permit adjacency or next-hop resolution, so the relevant answer is “Increase the OSPF hello interval rather than fixing different connected subnets”.
B:“Troubleshoot BGP route export on a Layer 2 connection whose static path points to the wrong port” represents a different ACI defect involving the external Layer 2 binding no longer matches the physical port after the move. The shortcut sought here preserves the connected interface addressing does not permit adjacency or next-hop resolution, so the relevant answer is “Increase the OSPF hello interval rather than fixing different connected subnets”.
C:“Ignore external spanning tree because ACI itself uses a spine-and-leaf topology” represents a different ACI defect involving external switching loop-prevention behavior was not coordinated with the ACI attachment design. The shortcut sought here preserves the connected interface addressing does not permit adjacency or next-hop resolution, so the relevant answer is “Increase the OSPF hello interval rather than fixing different connected subnets”.
Question 416
During a data center change at fictional Pinecrest Travel, the following issue occurs: A routed L3Out adjacency stays unstable because the external peer's interface MTU conflicts with the agreed packet size. What targeted correction should the engineer select?
- Review L3Out import policy and route preference so only an approved default route is accepted and used.
- Validate the supported link and protocol MTU parameters on both ends and align them.
- Inspect border-leaf L3Out interface, neighbor, route and fault state before changing application contracts.
- Review and enable the supported MCP configuration on the relevant ACI fabric/access boundary.
Explanation
Correct Answer
B:The direct correction is to validate the supported link and protocol MTU parameters on both ends and align them. This addresses the specific defect: The border leaf and external router do not share the required transport MTU assumptions. Validate the outcome by confirming: The intended routing adjacency remains stable and representative packets pass at the approved MTU.
Incorrect Answers
A:“Review L3Out import policy and route preference so only an approved default route is accepted and used” addresses the external route-import design accepts a default route without considering route preference and business policy, but the ACI fault here is the border leaf and external router do not share the required transport MTU assumptions. The appropriate implementation is “Validate the supported link and protocol MTU parameters on both ends and align them”.
C:“Inspect border-leaf L3Out interface, neighbor, route and fault state before changing application contracts” addresses the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes, but the ACI fault here is the border leaf and external router do not share the required transport MTU assumptions. The appropriate implementation is “Validate the supported link and protocol MTU parameters on both ends and align them”.
D:“Review and enable the supported MCP configuration on the relevant ACI fabric/access boundary” addresses the intended Mis-Cabling Protocol policy or boundary behavior is missing or not verified, but the ACI fault here is the border leaf and external router do not share the required transport MTU assumptions. The appropriate implementation is “Validate the supported link and protocol MTU parameters on both ends and align them”.
Question 417
During a Cisco ACI troubleshooting review at fictional Pinecrest Travel, the team finds: A routed L3Out adjacency stays unstable because the external peer's interface MTU conflicts with the agreed packet size. Which design or configuration mistake best accounts for the observation?
- The external route-import design accepts a default route without considering route preference and business policy.
- The investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes.
- The border leaf and external router do not share the required transport MTU assumptions.
- The intended Mis-Cabling Protocol policy or boundary behavior is missing or not verified.
Explanation
Correct Answer
C:The configuration explains the observed behavior because the border leaf and external router do not share the required transport MTU assumptions. The remedy is: Validate the supported link and protocol MTU parameters on both ends and align them.
Incorrect Answers
A:“The external route-import design accepts a default route without considering route preference and business policy” would imply the external route-import design accepts a default route without considering route preference and business policy. The observed fabric issue instead points to the border leaf and external router do not share the required transport MTU assumptions.
B:“The investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes” would imply the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes. The observed fabric issue instead points to the border leaf and external router do not share the required transport MTU assumptions.
D:“The intended Mis-Cabling Protocol policy or boundary behavior is missing or not verified” would imply the intended Mis-Cabling Protocol policy or boundary behavior is missing or not verified. The observed fabric issue instead points to the border leaf and external router do not share the required transport MTU assumptions.
Question 418
A change-validation meeting at fictional Pinecrest Travel reviews this issue: A routed L3Out adjacency stays unstable because the external peer's interface MTU conflicts with the agreed packet size. Which test outcome should be required for sign-off?
- The VRF selects the documented path for sampled destinations after the route-policy adjustment.
- The fault evidence identifies and resolves the actual failed routing component without deleting unrelated tenant objects.
- The mis-cabled test generates the expected protection observation without persistent data-plane looping.
- The intended routing adjacency remains stable and representative packets pass at the approved MTU.
Explanation
Correct Answer
D:This verifies the intended ACI change: Validate the supported link and protocol MTU parameters on both ends and align them. It addresses the original behavior rather than only showing unrelated system health.
Incorrect Answers
A:“The VRF selects the documented path for sampled destinations after the route-policy adjustment” could verify the external route-import design accepts a default route without considering route preference and business policy, not the border leaf and external router do not share the required transport MTU assumptions. Confirm instead that the intended routing adjacency remains stable and representative packets pass at the approved MTU.
B:“The fault evidence identifies and resolves the actual failed routing component without deleting unrelated tenant objects” could verify the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes, not the border leaf and external router do not share the required transport MTU assumptions. Confirm instead that the intended routing adjacency remains stable and representative packets pass at the approved MTU.
C:“The mis-cabled test generates the expected protection observation without persistent data-plane looping” could verify the intended Mis-Cabling Protocol policy or boundary behavior is missing or not verified, not the border leaf and external router do not share the required transport MTU assumptions. Confirm instead that the intended routing adjacency remains stable and representative packets pass at the approved MTU.
Question 419
The operations team at fictional Pinecrest Travel wants to detect recurrence of: A routed L3Out adjacency stays unstable because the external peer's interface MTU conflicts with the agreed packet size. Which repeatable control should be adopted?
- Repeat a documented regression test confirming: the VRF selects the documented path for sampled destinations after the route-policy adjustment.
- Repeat a documented regression test confirming: the fault evidence identifies and resolves the actual failed routing component without deleting unrelated tenant objects.
- Repeat a documented regression test confirming: the intended routing adjacency remains stable and representative packets pass at the approved MTU.
- Repeat a documented regression test confirming: the mis-cabled test generates the expected protection observation without persistent data-plane looping.
Explanation
Correct Answer
C:The selected control exercises the intended Border leaf link MTU design. Without checking this result, the team may overlook a recurrence of the original issue.
Incorrect Answers
A:“Repeat a documented regression test confirming: the VRF selects the documented path for sampled destinations after the route-policy adjustment” is a regression check for the external route-import design accepts a default route without considering route preference and business policy. It does not retest the actual failure, the border leaf and external router do not share the required transport MTU assumptions; use the case-specific result “Repeat a documented regression test confirming: the intended routing adjacency remains stable and representative packets pass at the approved MTU”.
B:“Repeat a documented regression test confirming: the fault evidence identifies and resolves the actual failed routing component without deleting unrelated tenant objects” is a regression check for the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes. It does not retest the actual failure, the border leaf and external router do not share the required transport MTU assumptions; use the case-specific result “Repeat a documented regression test confirming: the intended routing adjacency remains stable and representative packets pass at the approved MTU”.
D:“Repeat a documented regression test confirming: the mis-cabled test generates the expected protection observation without persistent data-plane looping” is a regression check for the intended Mis-Cabling Protocol policy or boundary behavior is missing or not verified. It does not retest the actual failure, the border leaf and external router do not share the required transport MTU assumptions; use the case-specific result “Repeat a documented regression test confirming: the intended routing adjacency remains stable and representative packets pass at the approved MTU”.
Question 420
Engineers at fictional Pinecrest Travel want to avoid repeating: A routed L3Out adjacency stays unstable because the external peer's interface MTU conflicts with the agreed packet size. Which proposed action is unsafe for this specific reason?
- Import all provider defaults into every connected VRF without route policy review.
- Ignore recurring OSPF adjacency resets and declare the fabric healthy from link state alone.
- Rebuild every EPG as the first response to an external BGP neighbor-down fault.
- Disable all loop-detection policies and rely only on interface link lights.
Explanation
Correct Answer
B:This proposal reintroduces the underlying failure: The border leaf and external router do not share the required transport MTU assumptions. The supported alternative is: Validate the supported link and protocol MTU parameters on both ends and align them.
Incorrect Answers
A:“Import all provider defaults into every connected VRF without route policy review” represents a different ACI defect involving the external route-import design accepts a default route without considering route preference and business policy. The shortcut sought here preserves the border leaf and external router do not share the required transport MTU assumptions, so the relevant answer is “Ignore recurring OSPF adjacency resets and declare the fabric healthy from link state alone”.
C:“Rebuild every EPG as the first response to an external BGP neighbor-down fault” represents a different ACI defect involving the investigation skips border routing and L3Out fault isolation in favor of unrelated tenant changes. The shortcut sought here preserves the border leaf and external router do not share the required transport MTU assumptions, so the relevant answer is “Ignore recurring OSPF adjacency resets and declare the fabric healthy from link state alone”.
D:“Disable all loop-detection policies and rely only on interface link lights” represents a different ACI defect involving the intended Mis-Cabling Protocol policy or boundary behavior is missing or not verified. The shortcut sought here preserves the border leaf and external router do not share the required transport MTU assumptions, so the relevant answer is “Ignore recurring OSPF adjacency resets and declare the fabric healthy from link state alone”.