Pass Cisco DCACI 300-620 Exam in First Attempt Easily

Latest Cisco DCACI 300-620 Practice Test Questions, DCACI Exam Dumps
Accurate & Verified Answers As Experienced in the Actual Test!

You save
$39.99
Save
Verified by experts
300-620 Premium Bundle
Exam Code: 300-620
Exam Name: Implementing Cisco Application Centric Infrastructure (DCACI)
Certification Provider: Cisco
Bundle includes 3 products: Premium File, Training Course, Study Guide
accept downloads in the last 7 days
300-620 Premium Bundle
  • Premium File 450 Questions & Answers
    Last Update: Nov 15, 2026
  • Training Course 38 Lectures
  • Study Guide 1221 Pages

Implementing Cisco Application Centric Infrastructure (DCACI) 300-620 Practice Test 33

Question 320

Engineers at fictional Pinecrest Travel want to avoid repeating: A team wants to extend a small legacy VLAN but proposes stretching every tenant BD to the outside switch. Which proposed action is unsafe for this specific reason?

  1. Call any pair of cables a redundant vPC without configuring the ACI vPC relationship.
  2. Change endpoint group contracts while the L3Out logical node remains unassigned.
  3. Flood all tenant broadcast domains into the legacy switching environment for convenience.
  4. Change the L3Out contract filter to mask a BGP autonomous-system mismatch.

Explanation

Correct Answer

C:

The proposed shortcut would preserve the wrong assumption at Pinecrest Travel. The team should instead implement: Limit the Layer 2 connectivity design to the required BD and VLAN and document boundary policies.

Incorrect Answers

A:

“Call any pair of cables a redundant vPC without configuring the ACI vPC relationship” represents a different ACI defect involving the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. The shortcut sought here preserves the extension's broadcast and failure-domain scope exceeds the migration requirement, so the relevant answer is “Flood all tenant broadcast domains into the legacy switching environment for convenience”.

B:

“Change endpoint group contracts while the L3Out logical node remains unassigned” represents a different ACI defect involving the routed external policy is not targeted at the physical border leaf that owns the interface. The shortcut sought here preserves the extension's broadcast and failure-domain scope exceeds the migration requirement, so the relevant answer is “Flood all tenant broadcast domains into the legacy switching environment for convenience”.

D:

“Change the L3Out contract filter to mask a BGP autonomous-system mismatch” represents a different ACI defect involving the BGP neighbor configuration uses an incorrect remote autonomous system value. The shortcut sought here preserves the extension's broadcast and failure-domain scope exceeds the migration requirement, so the relevant answer is “Flood all tenant broadcast domains into the legacy switching environment for convenience”.

Question 321

At fictional Harbor Research (scientific computing), the ACI operations team observes: After one border leaf fails, a legacy switch loses its only L2 path despite two physically present cables. Which change most directly addresses the issue?

  1. Plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage.
  2. Build and validate the supported vPC or channel design with consistent EPG path binding on both leaves.
  3. Bind the correct routed port or SVI interface profile with appropriate encapsulation and IP settings.
  4. Verify reachable peer endpoints and configure the supported multihop or interface peering design.

Explanation

Correct Answer

B:

The reported condition follows because the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. The selected action repairs that policy or forwarding relationship. A meaningful acceptance check is: The permitted VLAN continues forwarding after an approved one-leaf failure test.

Incorrect Answers

A:

“Plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage” addresses the migration has duplicate Layer 3 gateway ownership on a bridged segment, but the ACI fault here is the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. The appropriate implementation is “Build and validate the supported vPC or channel design with consistent EPG path binding on both leaves”.

C:

“Bind the correct routed port or SVI interface profile with appropriate encapsulation and IP settings” addresses the L3Out logical interface profile does not select the correct leaf interface, but the ACI fault here is the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. The appropriate implementation is “Build and validate the supported vPC or channel design with consistent EPG path binding on both leaves”.

D:

“Verify reachable peer endpoints and configure the supported multihop or interface peering design” addresses the L3Out BGP session lacks appropriate transport reachability to its chosen peer address, but the ACI fault here is the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. The appropriate implementation is “Build and validate the supported vPC or channel design with consistent EPG path binding on both leaves”.

Question 322

The network incident record for fictional Harbor Research states: After one border leaf fails, a legacy switch loses its only L2 path despite two physically present cables. What underlying fault should the engineer investigate first?

  1. The L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment.
  2. The migration has duplicate Layer 3 gateway ownership on a bridged segment.
  3. The L3Out logical interface profile does not select the correct leaf interface.
  4. The L3Out BGP session lacks appropriate transport reachability to its chosen peer address.

Explanation

Correct Answer

A:

At Harbor Research, the problem is not solved by unrelated EPG changes. The L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. The correct follow-up is: Build and validate the supported vPC or channel design with consistent EPG path binding on both leaves.

Incorrect Answers

B:

The alternative diagnosis concerns Layer 2 migration and gateway ownership. Here the distinguishing issue is: The L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment.

C:

The alternative diagnosis concerns Logical interface profile. Here the distinguishing issue is: The L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment.

D:

The alternative diagnosis concerns BGP peer source reachability. Here the distinguishing issue is: The L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment.

Question 323

The network lead at fictional Harbor Research is validating remediation of: After one border leaf fails, a legacy switch loses its only L2 path despite two physically present cables. Which result confirms the specific fix?

  1. The permitted VLAN continues forwarding after an approved one-leaf failure test.
  2. Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.
  3. The external interface has the expected L3 addressing and link protocol state.
  4. The intended BGP TCP session establishes and accepted routes are visible.

Explanation

Correct Answer

A:

For sign-off, the engineer must see the expected result: The permitted VLAN continues forwarding after an approved one-leaf failure test. That demonstrates the targeted L2 attachment vPC resilience behavior is functioning.

Incorrect Answers

B:

“Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access” could verify the migration has duplicate Layer 3 gateway ownership on a bridged segment, not the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. Confirm instead that the permitted VLAN continues forwarding after an approved one-leaf failure test.

C:

“The external interface has the expected L3 addressing and link protocol state” could verify the L3Out logical interface profile does not select the correct leaf interface, not the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. Confirm instead that the permitted VLAN continues forwarding after an approved one-leaf failure test.

D:

“The intended BGP TCP session establishes and accepted routes are visible” could verify the L3Out BGP session lacks appropriate transport reachability to its chosen peer address, not the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment. Confirm instead that the permitted VLAN continues forwarding after an approved one-leaf failure test.

Question 324

After correcting this issue at fictional Harbor Research: After one border leaf fails, a legacy switch loses its only L2 path despite two physically present cables. Which scheduled check best protects the corrected design?

  1. Repeat a documented regression test confirming: the permitted VLAN continues forwarding after an approved one-leaf failure test.
  2. Repeat a documented regression test confirming: hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.
  3. Repeat a documented regression test confirming: the external interface has the expected L3 addressing and link protocol state.
  4. Repeat a documented regression test confirming: the intended BGP TCP session establishes and accepted routes are visible.

Explanation

Correct Answer

A:

This repeating check can reveal regression of the L2 attachment vPC resilience control because it verifies: The permitted VLAN continues forwarding after an approved one-leaf failure test. It tests the original failure condition, not general fabric availability.

Incorrect Answers

B:

That recurring check is useful for Layer 2 migration and gateway ownership, not for detecting the current L2 attachment vPC resilience regression. The desired recurring result is: The permitted VLAN continues forwarding after an approved one-leaf failure test.

C:

That recurring check is useful for Logical interface profile, not for detecting the current L2 attachment vPC resilience regression. The desired recurring result is: The permitted VLAN continues forwarding after an approved one-leaf failure test.

D:

That recurring check is useful for BGP peer source reachability, not for detecting the current L2 attachment vPC resilience regression. The desired recurring result is: The permitted VLAN continues forwarding after an approved one-leaf failure test.

Question 325

At fictional Harbor Research, the team is reviewing shortcuts for the following ACI issue: After one border leaf fails, a legacy switch loses its only L2 path despite two physically present cables. Which proposal would recreate the same failure?

  1. Keep duplicate active default gateways indefinitely and expect hosts to select the correct one.
  2. Call any pair of cables a redundant vPC without configuring the ACI vPC relationship.
  3. Assume a logical node profile automatically configures every routed interface on that node.
  4. Assume a configured BGP neighbor IP is reachable without any connected or routed path.

Explanation

Correct Answer

B:

That shortcut contradicts the intended L2 attachment vPC resilience implementation. The safer response is to build and validate the supported vPC or channel design with consistent EPG path binding on both leaves.

Incorrect Answers

A:

“Keep duplicate active default gateways indefinitely and expect hosts to select the correct one” represents a different ACI defect involving the migration has duplicate Layer 3 gateway ownership on a bridged segment. The shortcut sought here preserves the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment, so the relevant answer is “Call any pair of cables a redundant vPC without configuring the ACI vPC relationship”.

C:

“Assume a logical node profile automatically configures every routed interface on that node” represents a different ACI defect involving the L3Out logical interface profile does not select the correct leaf interface. The shortcut sought here preserves the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment, so the relevant answer is “Call any pair of cables a redundant vPC without configuring the ACI vPC relationship”.

D:

“Assume a configured BGP neighbor IP is reachable without any connected or routed path” represents a different ACI defect involving the L3Out BGP session lacks appropriate transport reachability to its chosen peer address. The shortcut sought here preserves the L2 boundary redundancy has not been implemented and tested as a valid supported dual-homed attachment, so the relevant answer is “Call any pair of cables a redundant vPC without configuring the ACI vPC relationship”.

Question 326

A Cisco ACI deployment review at fictional Meridian Analytics identifies this condition: During a legacy VLAN move, both a traditional switch SVI and the ACI BD gateway answer for the same default gateway IP. What is the most appropriate next configuration action?

  1. Plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage.
  2. Associate the L3Out with the intended VRF and confirm that its external routing policies are correct.
  3. Use a supported SVI or subinterface design with matching VLAN encapsulation on both ends.
  4. Correct the static next-hop and validate that it resolves through the intended external interface.

Explanation

Correct Answer

A:

The reported condition follows because the migration has duplicate Layer 3 gateway ownership on a bridged segment. The selected action repairs that policy or forwarding relationship. A meaningful acceptance check is: Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

Incorrect Answers

B:

“Associate the L3Out with the intended VRF and confirm that its external routing policies are correct” addresses the external routed connection is associated with a different routing context from the application BD, but the ACI fault here is the migration has duplicate Layer 3 gateway ownership on a bridged segment. The appropriate implementation is “Plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage”.

C:

“Use a supported SVI or subinterface design with matching VLAN encapsulation on both ends” addresses the chosen L3Out interface mode does not match the external 802.1Q handoff, but the ACI fault here is the migration has duplicate Layer 3 gateway ownership on a bridged segment. The appropriate implementation is “Plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage”.

D:

“Correct the static next-hop and validate that it resolves through the intended external interface” addresses the static route uses an invalid next-hop for the L3Out interface topology, but the ACI fault here is the migration has duplicate Layer 3 gateway ownership on a bridged segment. The appropriate implementation is “Plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage”.

Question 327

At fictional Meridian Analytics, an ACI deployment failed in this way: During a legacy VLAN move, both a traditional switch SVI and the ACI BD gateway answer for the same default gateway IP. Which technical cause best explains it?

  1. The external routed connection is associated with a different routing context from the application BD.
  2. The chosen L3Out interface mode does not match the external 802.1Q handoff.
  3. The migration has duplicate Layer 3 gateway ownership on a bridged segment.
  4. The static route uses an invalid next-hop for the L3Out interface topology.

Explanation

Correct Answer

C:

At Meridian Analytics, the problem is not solved by unrelated EPG changes. The migration has duplicate Layer 3 gateway ownership on a bridged segment. The correct follow-up is: Plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage.

Incorrect Answers

A:

The alternative diagnosis concerns L3Out VRF binding. Here the distinguishing issue is: The migration has duplicate Layer 3 gateway ownership on a bridged segment.

B:

The alternative diagnosis concerns Routed interface versus SVI. Here the distinguishing issue is: The migration has duplicate Layer 3 gateway ownership on a bridged segment.

D:

The alternative diagnosis concerns L3Out static route next hop. Here the distinguishing issue is: The migration has duplicate Layer 3 gateway ownership on a bridged segment.

Question 328

For the ACI issue at fictional Meridian Analytics: During a legacy VLAN move, both a traditional switch SVI and the ACI BD gateway answer for the same default gateway IP. Which finding best demonstrates a successful implementation?

  1. The approved external prefixes appear in the application's intended VRF routing table.
  2. The routed adjacency establishes over the expected tagged VLAN handoff.
  3. The route is active and data-plane traffic follows the approved reachable next hop.
  4. Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

Explanation

Correct Answer

D:

For sign-off, the engineer must see the expected result: Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access. That demonstrates the targeted Layer 2 migration and gateway ownership behavior is functioning.

Incorrect Answers

A:

“The approved external prefixes appear in the application's intended VRF routing table” could verify the external routed connection is associated with a different routing context from the application BD, not the migration has duplicate Layer 3 gateway ownership on a bridged segment. Confirm instead that hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

B:

“The routed adjacency establishes over the expected tagged VLAN handoff” could verify the chosen L3Out interface mode does not match the external 802.1Q handoff, not the migration has duplicate Layer 3 gateway ownership on a bridged segment. Confirm instead that hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

C:

“The route is active and data-plane traffic follows the approved reachable next hop” could verify the static route uses an invalid next-hop for the L3Out interface topology, not the migration has duplicate Layer 3 gateway ownership on a bridged segment. Confirm instead that hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

Question 329

Following remediation at fictional Meridian Analytics, what recurring validation should guard against this failure returning? The original issue was: During a legacy VLAN move, both a traditional switch SVI and the ACI BD gateway answer for the same default gateway IP.

  1. Repeat a documented regression test confirming: the approved external prefixes appear in the application's intended VRF routing table.
  2. Repeat a documented regression test confirming: the routed adjacency establishes over the expected tagged VLAN handoff.
  3. Repeat a documented regression test confirming: hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.
  4. Repeat a documented regression test confirming: the route is active and data-plane traffic follows the approved reachable next hop.

Explanation

Correct Answer

C:

This repeating check can reveal regression of the Layer 2 migration and gateway ownership control because it verifies: Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access. It tests the original failure condition, not general fabric availability.

Incorrect Answers

A:

That recurring check is useful for L3Out VRF binding, not for detecting the current Layer 2 migration and gateway ownership regression. The desired recurring result is: Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

B:

That recurring check is useful for Routed interface versus SVI, not for detecting the current Layer 2 migration and gateway ownership regression. The desired recurring result is: Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

D:

That recurring check is useful for L3Out static route next hop, not for detecting the current Layer 2 migration and gateway ownership regression. The desired recurring result is: Hosts observe one expected gateway MAC after cutover and retain permitted inter-subnet access.

Question 330

A change reviewer at fictional Meridian Analytics sees: During a legacy VLAN move, both a traditional switch SVI and the ACI BD gateway answer for the same default gateway IP. Which tempting simplification should be rejected?

  1. Add the same external address to every tenant VRF without reviewing the L3Out context.
  2. Keep duplicate active default gateways indefinitely and expect hosts to select the correct one.
  3. Configure the external side as tagged while keeping the ACI routed port untagged.
  4. Keep the unreachable static next hop and add an unrelated contract.

Explanation

Correct Answer

B:

That shortcut contradicts the intended Layer 2 migration and gateway ownership implementation. The safer response is to plan and validate the gateway cutover so exactly the intended router owns the gateway at each stage.

Incorrect Answers

A:

“Add the same external address to every tenant VRF without reviewing the L3Out context” represents a different ACI defect involving the external routed connection is associated with a different routing context from the application BD. The shortcut sought here preserves the migration has duplicate Layer 3 gateway ownership on a bridged segment, so the relevant answer is “Keep duplicate active default gateways indefinitely and expect hosts to select the correct one”.

C:

“Configure the external side as tagged while keeping the ACI routed port untagged” represents a different ACI defect involving the chosen L3Out interface mode does not match the external 802.1Q handoff. The shortcut sought here preserves the migration has duplicate Layer 3 gateway ownership on a bridged segment, so the relevant answer is “Keep duplicate active default gateways indefinitely and expect hosts to select the correct one”.

D:

“Keep the unreachable static next hop and add an unrelated contract” represents a different ACI defect involving the static route uses an invalid next-hop for the L3Out interface topology. The shortcut sought here preserves the migration has duplicate Layer 3 gateway ownership on a bridged segment, so the relevant answer is “Keep duplicate active default gateways indefinitely and expect hosts to select the correct one”.

Implementing Cisco Application Centric Infrastructure (DCACI) (300-620) Practice Tests

Purchase Cisco DCACI 300-620 Exam Training Products Individually

300-620 Questions & Answers
Premium File
450 Questions & Answers
Last Update: Nov 15, 2026
$59.99
300-620 Training Course
38 Lectures
$24.99
300-620 Study Guide
Study Guide
1221 Pages
$24.99
accept downloads in the last 7 days
What exactly is 300-620 Premium File?

The 300-620 Premium File has been developed by industry professionals, who have been working with IT certifications for years and have close ties with IT certification vendors and holders - with most recent exam questions and valid answers.

300-620 Premium File is presented in VCE format. VCE (Virtual CertExam) is a file format that realistically simulates 300-620 exam environment, allowing for the most convenient exam preparation you can get - in the convenience of your own home or on the go. If you have ever seen IT exam simulations, chances are, they were in the VCE format.

What is VCE?

VCE is a file format associated with Visual CertExam Software. This format and software are widely used for creating tests for IT certifications. To create and open VCE files, you will need to purchase, download and install VCE Exam Simulator on your computer.

Can I try it for free?

Yes, you can. Look through free VCE files section and download any file you choose absolutely free.

Where do I get VCE Exam Simulator?

VCE Exam Simulator can be purchased from its developer, https://www.avanset.com. Please note that Exam-Labs does not sell or support this software. Should you have any questions or concerns about using this product, please contact Avanset support team directly.

How are Premium VCE files different from Free VCE files?

Premium VCE files have been developed by industry professionals, who have been working with IT certifications for years and have close ties with IT certification vendors and holders - with most recent exam questions and some insider information.

Free VCE files All files are sent by Exam-labs community members. We encourage everyone who has recently taken an exam and/or has come across some braindumps that have turned out to be true to share this information with the community by creating and sending VCE files. We don't say that these free VCEs sent by our members aren't reliable (experience shows that they are). But you should use your critical thinking as to what you download and memorize.

How long will I receive updates for 300-620 Premium VCE File that I purchased?

Free updates are available during 30 days after you purchased Premium VCE file. After 30 days the file will become unavailable.

How can I get the products after purchase?

All products are available for download immediately from your Member's Area. Once you have made the payment, you will be transferred to Member's Area where you can login and download the products you have purchased to your PC or another device.

Will I be able to renew my products when they expire?

Yes, when the 30 days of your product validity are over, you have the option of renewing your expired products with a 30% discount. This can be done in your Member's Area.

Please note that you will not be able to use the product after it has expired if you don't renew it.

How often are the questions updated?

We always try to provide the latest pool of questions, Updates in the questions depend on the changes in actual pool of questions by different vendors. As soon as we know about the change in the exam question pool we try our best to update the products as fast as possible.

What is a Study Guide?

Study Guides available on Exam-Labs are built by industry professionals who have been working with IT certifications for years. Study Guides offer full coverage on exam objectives in a systematic approach. Study Guides are very useful for fresh applicants and provides background knowledge about preparation of exams.

How can I open a Study Guide?

Any study guide can be opened by an official Acrobat by Adobe or any other reader application you use.

What is a Training Course?

Training Courses we offer on Exam-Labs in video format are created and managed by IT professionals. The foundation of each course are its lectures, which can include videos, slides and text. In addition, authors can add resources and various types of practice activities, as a way to enhance the learning experience of students.

Enter Your Email Address to Proceed

Please fill out your email address below in order to purchase Certification/Exam.

A confirmation link will be sent to this email address to verify your login.

Make sure to enter correct email address.

Enter Your Email Address to Proceed

Please fill out your email address below in order to purchase Demo.

A confirmation link will be sent to this email address to verify your login.

Make sure to enter correct email address.

Still Not Convinced?

Download 12 Sample Questions that you Will see in your
Cisco 300-620 exam.

Download 12 Free Questions

or Guarantee your success by buying the full version which covers
the full latest pool of questions. (450 Questions, Last Updated on
Nov 15, 2026)

How It Works

Download Exam
Step 1. Choose Exam
on Exam-Labs
Download IT Exams Questions & Answers
Download Avanset Simulator
Step 2. Open Exam with
Avanset Exam Simulator
Press here to download VCE Exam Simulator that simulates latest exam environment
Study
Step 3. Study
& Pass
IT Exams Anywhere, Anytime!

SPECIAL OFFER: GET 10% OFF. This is ONE TIME OFFER

You save
10%
Save
Exam-Labs Special Discount

Enter Your Email Address to Receive Your 10% Off Discount Code

A confirmation link will be sent to this email address to verify your login

* We value your privacy. We will not rent or sell your email address.

SPECIAL OFFER: GET 10% OFF

You save
10%
Save
Exam-Labs Special Discount

USE DISCOUNT CODE:

A confirmation link was sent to your email.

Please check your mailbox for a message from [email protected] and follow the directions.