PECB Certified ISO/IEC 42001 Lead Implementer Lead Implementer 42001 Practice Test 68
Question 670
At Fictional Lumen Publishing, the live AI management controls is undergoing an ISO/IEC 42001 implementation review after a stakeholder-impact concern. The observed failure is: A deployed model's risk acceptance record is missing from the launch log, leaving uncertainty about who authorized its use. Affected users and existing AI services must remain protected while the team verifies the governance correction. Which proposed shortcut must be REJECTED because it weakens reliability, correctness, auditability, or access control?
- For Fictional Lumen Publishing while preserving approved oversight, backfill approvals after release using undated verbal assurances from project staff.
- For Fictional Lumen Publishing while preserving approved oversight, a sampled live AI version can be traced to its testing, approved risk decision, implementation owner, and deployment timestamp.
- For Fictional Lumen Publishing while preserving approved oversight, reconcile approval and deployment logs at each release and investigate unmatched changes.
- For Fictional Lumen Publishing while preserving approved oversight, record immutable release identifiers, approval references, applicable assessments, and operational configuration in a controlled audit trail.
Explanation
Correct Answer
A:Do not backfill approvals after release using undated verbal assurances from project staff. Release traceability requires linking AI configuration, approval decisions, tests, and accountable owners to the deployed state. Record immutable release identifiers, approval references, applicable assessments, and operational configuration in a controlled audit trail. A sampled live AI version can be traced to its testing, approved risk decision, implementation owner, and deployment timestamp.
Incorrect Answers
B:A sampled live AI version can be traced to its testing, approved risk decision, implementation owner, and deployment timestamp. This is measurable acceptance evidence rather than a risky change. It provides evidence that the scoped remediation was successful: Record immutable release identifiers, approval references, applicable assessments, and operational configuration in a controlled audit trail. The unsafe step is to backfill approvals after release using undated verbal assurances from project staff.
C:Reconcile approval and deployment logs at each release and investigate unmatched changes. This is a preventive operational safeguard that reduces recurrence because release traceability requires linking AI configuration, approval decisions, tests, and accountable owners to the deployed state. It should be retained. The unsafe proposal is backfill approvals after release using undated verbal assurances from project staff.
D:Record immutable release identifiers, approval references, applicable assessments, and operational configuration in a controlled audit trail. This is the controlled remediation, not the unsafe shortcut. It addresses release traceability requires linking AI configuration, approval decisions, tests, and accountable owners to the deployed state. The unsafe step is to backfill approvals after release using undated verbal assurances from project staff.
Question 671
At Fictional Glacier Manufacturing, the responsible AI evaluation function is undergoing an ISO/IEC 42001 implementation review during a formal AIMS readiness review. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The governance review board requires an observable outcome and preservation of approved accountability. Which scoped implementation action should the AIMS lead take first?
- For Fictional Glacier Manufacturing under the scoped AI governance decision, identify the actual decision-review measure, define a baseline and target, and reconcile sampled cases with reported results.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, assign an impartial qualified auditor outside the audited control responsibility and document the audit criteria, scope, and evidence.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, aggregate incident categories and severity trends, examine recurring causes, and report treatment priorities to AIMS owners.
Explanation
Correct Answer
C:Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
A:Identify the actual decision-review measure, define a baseline and target, and reconcile sampled cases with reported results. Performance evaluation must measure whether the defined objective was achieved, not substitute an unrelated activity indicator. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
B:Assign an impartial qualified auditor outside the audited control responsibility and document the audit criteria, scope, and evidence. Internal audit conclusions need suitable competence, objectivity, and freedom from conflicts of interest to provide credible assurance. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
D:Aggregate incident categories and severity trends, examine recurring causes, and report treatment priorities to AIMS owners. Incident patterns reveal systemic control weaknesses that single-ticket closure may conceal. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
Question 672
At Fictional Glacier Manufacturing, the responsible AI evaluation function is undergoing an ISO/IEC 42001 implementation review during a formal AIMS readiness review. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The governance review board requires an observable outcome and preservation of approved accountability. Which underlying mechanism best explains these symptoms?
- For Fictional Glacier Manufacturing under the scoped AI governance decision, activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, performance evaluation must measure whether the defined objective was achieved, not substitute an unrelated activity indicator.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, AI quality can degrade without infrastructure failure; drift and model-performance thresholds require their own control signals.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, monitoring overall AI accuracy can hide shifts in outcome equity across groups when context calls for subgroup assessment.
Explanation
Correct Answer
A:Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
B:Performance evaluation must measure whether the defined objective was achieved, not substitute an unrelated activity indicator. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
C:AI quality can degrade without infrastructure failure; drift and model-performance thresholds require their own control signals. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
D:Monitoring overall AI accuracy can hide shifts in outcome equity across groups when context calls for subgroup assessment. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
Question 673
At Fictional Glacier Manufacturing, the responsible AI evaluation function is undergoing an ISO/IEC 42001 implementation review during a formal AIMS readiness review. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The governance review board requires an observable outcome and preservation of approved accountability. Which observable acceptance test most directly shows that this defect is fixed?
- For Fictional Glacier Manufacturing under the scoped AI governance decision, the expanded deployment has a dated impact reassessment incorporating observed outcomes and revised risk decisions.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, independent evaluators using the documented method reproduce the same metric from the same controlled test data.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, a management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, review minutes document discussed evidence, specific decisions, owners, resources, and due dates.
Explanation
Correct Answer
C:A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
Incorrect Answers
A:The expanded deployment has a dated impact reassessment incorporating observed outcomes and revised risk decisions. Evidence for post-deployment impact review concerns a different issue. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
B:Independent evaluators using the documented method reproduce the same metric from the same controlled test data. Evidence for measurement repeatability and data quality concerns a different issue. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
D:Review minutes document discussed evidence, specific decisions, owners, resources, and due dates. Evidence for management review inputs and outputs concerns a different issue. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Question 674
At Fictional Glacier Manufacturing, the responsible AI evaluation function is undergoing an ISO/IEC 42001 implementation review during a formal AIMS readiness review. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The governance review board requires an observable outcome and preservation of approved accountability. Which recurring safeguard best prevents this specific failure from recurring?
- For Fictional Glacier Manufacturing under the scoped AI governance decision, review audit independence and skill needs when new AIMS technologies and organizational roles emerge.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, analyze cross-team incident patterns after significant model and workflow changes.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, review indicators for relevance and data quality after business and AI risk changes.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, reassess target achievement and data reliability at each management evaluation cycle.
Explanation
Correct Answer
C:Review indicators for relevance and data quality after business and AI risk changes. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
A:Review audit independence and skill needs when new AIMS technologies and organizational roles emerge. Internal AIMS audit independence is a separate risk. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Review indicators for relevance and data quality after business and AI risk changes.
B:Analyze cross-team incident patterns after significant model and workflow changes. AI incident trend analysis is a separate risk. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Review indicators for relevance and data quality after business and AI risk changes.
D:Reassess target achievement and data reliability at each management evaluation cycle. AIMS objective outcome verification is a separate risk. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Review indicators for relevance and data quality after business and AI risk changes.
Question 675
At Fictional Glacier Manufacturing, the responsible AI evaluation function is undergoing an ISO/IEC 42001 implementation review during a formal AIMS readiness review. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The governance review board requires an observable outcome and preservation of approved accountability. Which proposed shortcut must be REJECTED because it weakens reliability, correctness, auditability, or access control?
- For Fictional Glacier Manufacturing under the scoped AI governance decision, a management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, review indicators for relevance and data quality after business and AI risk changes.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
- For Fictional Glacier Manufacturing under the scoped AI governance decision, use the number of launched models as the single proof that the AIMS is effective.
Explanation
Correct Answer
D:Do not use the number of launched models as the single proof that the AIMS is effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
A:A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions. This is measurable acceptance evidence rather than a risky change. It provides evidence that the scoped remediation was successful: Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. The unsafe step is to use the number of launched models as the single proof that the AIMS is effective.
B:Review indicators for relevance and data quality after business and AI risk changes. This is a preventive operational safeguard that reduces recurrence because activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. It should be retained. The unsafe proposal is use the number of launched models as the single proof that the AIMS is effective.
C:Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. This is the controlled remediation, not the unsafe shortcut. It addresses activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. The unsafe step is to use the number of launched models as the single proof that the AIMS is effective.
Question 676
At Fictional Cedarline Retail, the AI monitoring and management review process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The responsible owner must preserve the prior approved state and avoid unnecessary access or policy changes. Which scoped implementation action should the AIMS lead take first?
- For Fictional Cedarline Retail while preserving approved oversight, select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
- For Fictional Cedarline Retail while preserving approved oversight, set reassessment triggers for use, population, harm signals, and complaints; update impact records with mitigation and approval.
- For Fictional Cedarline Retail while preserving approved oversight, request risk-appropriate supplier test records, service metrics, change notices, and evidence of corrective actions.
- For Fictional Cedarline Retail while preserving approved oversight, assemble appropriate performance, audit, risk, stakeholder, and corrective-action information for formal leadership review.
Explanation
Correct Answer
A:Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
B:Set reassessment triggers for use, population, harm signals, and complaints; update impact records with mitigation and approval. Actual consequences and affected stakeholders can change after deployment, requiring fresh impact evidence and responsive controls. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
C:Request risk-appropriate supplier test records, service metrics, change notices, and evidence of corrective actions. External assurance statements are insufficient if they do not show relevant tested controls, exceptions, and follow-up actions. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
D:Assemble appropriate performance, audit, risk, stakeholder, and corrective-action information for formal leadership review. Management review must use relevant evidence and result in recorded decisions about suitability, resources, and needed changes. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
Question 677
At Fictional Cedarline Retail, the AI monitoring and management review process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The responsible owner must preserve the prior approved state and avoid unnecessary access or policy changes. Which underlying mechanism best explains these symptoms?
- For Fictional Cedarline Retail while preserving approved oversight, a performance metric supports governance only when its method, data population, exclusions, and computation are defined and reproducible.
- For Fictional Cedarline Retail while preserving approved oversight, external assurance statements are insufficient if they do not show relevant tested controls, exceptions, and follow-up actions.
- For Fictional Cedarline Retail while preserving approved oversight, activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
- For Fictional Cedarline Retail while preserving approved oversight, incident patterns reveal systemic control weaknesses that single-ticket closure may conceal.
Explanation
Correct Answer
C:Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
A:A performance metric supports governance only when its method, data population, exclusions, and computation are defined and reproducible. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
B:External assurance statements are insufficient if they do not show relevant tested controls, exceptions, and follow-up actions. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
D:Incident patterns reveal systemic control weaknesses that single-ticket closure may conceal. Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes.
Question 678
At Fictional Cedarline Retail, the AI monitoring and management review process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The responsible owner must preserve the prior approved state and avoid unnecessary access or policy changes. Which observable acceptance test most directly shows that this defect is fixed?
- For Fictional Cedarline Retail while preserving approved oversight, a management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
- For Fictional Cedarline Retail while preserving approved oversight, a simulated performance deterioration triggers the correct alert and tracked response before the threshold is repeatedly exceeded.
- For Fictional Cedarline Retail while preserving approved oversight, the audit record identifies independent evaluation, representative sampling, findings, and accountable follow-up.
- For Fictional Cedarline Retail while preserving approved oversight, independent evaluators using the documented method reproduce the same metric from the same controlled test data.
Explanation
Correct Answer
A:A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
Incorrect Answers
B:A simulated performance deterioration triggers the correct alert and tracked response before the threshold is repeatedly exceeded. Evidence for operational drift monitoring thresholds concerns a different issue. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
C:The audit record identifies independent evaluation, representative sampling, findings, and accountable follow-up. Evidence for internal AIMS audit independence concerns a different issue. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
D:Independent evaluators using the documented method reproduce the same metric from the same controlled test data. Evidence for measurement repeatability and data quality concerns a different issue. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Question 679
At Fictional Cedarline Retail, the AI monitoring and management review process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The responsible owner must preserve the prior approved state and avoid unnecessary access or policy changes. Which recurring safeguard best prevents this specific failure from recurring?
- For Fictional Cedarline Retail while preserving approved oversight, review indicators for relevance and data quality after business and AI risk changes.
- For Fictional Cedarline Retail while preserving approved oversight, review audit independence and skill needs when new AIMS technologies and organizational roles emerge.
- For Fictional Cedarline Retail while preserving approved oversight, track changes in population and decision impact and schedule ongoing impact-assessment reviews.
- For Fictional Cedarline Retail while preserving approved oversight, periodically reconcile metrics with source events and review changes to calculation logic.
Explanation
Correct Answer
A:Review indicators for relevance and data quality after business and AI risk changes. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
B:Review audit independence and skill needs when new AIMS technologies and organizational roles emerge. Internal AIMS audit independence is a separate risk. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Review indicators for relevance and data quality after business and AI risk changes.
C:Track changes in population and decision impact and schedule ongoing impact-assessment reviews. Post-deployment impact review is a separate risk. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Review indicators for relevance and data quality after business and AI risk changes.
D:Periodically reconcile metrics with source events and review changes to calculation logic. Measurement repeatability and data quality is a separate risk. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Review indicators for relevance and data quality after business and AI risk changes.
Question 680
At Fictional Cedarline Retail, the AI monitoring and management review process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: Leadership reviews only the number of AI projects launched, ignoring whether approved governance controls or impact outcomes are effective. The responsible owner must preserve the prior approved state and avoid unnecessary access or policy changes. Which proposed shortcut must be REJECTED because it weakens reliability, correctness, auditability, or access control?
- For Fictional Cedarline Retail while preserving approved oversight, use the number of launched models as the single proof that the AIMS is effective.
- For Fictional Cedarline Retail while preserving approved oversight, a management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
- For Fictional Cedarline Retail while preserving approved oversight, review indicators for relevance and data quality after business and AI risk changes.
- For Fictional Cedarline Retail while preserving approved oversight, select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts.
Explanation
Correct Answer
A:Do not use the number of launched models as the single proof that the AIMS is effective. Activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions.
Incorrect Answers
B:A management scorecard reports agreed targets, current measurements, exceptions, owners, and required corrective decisions. This is measurable acceptance evidence rather than a risky change. It provides evidence that the scoped remediation was successful: Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. The unsafe step is to use the number of launched models as the single proof that the AIMS is effective.
C:Review indicators for relevance and data quality after business and AI risk changes. This is a preventive operational safeguard that reduces recurrence because activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. It should be retained. The unsafe proposal is use the number of launched models as the single proof that the AIMS is effective.
D:Select measurable AIMS indicators tied to objectives, control effectiveness, AI performance, and meaningful stakeholder impacts. This is the controlled remediation, not the unsafe shortcut. It addresses activity volume is not sufficient evidence of AIMS performance when objectives depend on risk reduction, assurance, and stakeholder outcomes. The unsafe step is to use the number of launched models as the single proof that the AIMS is effective.