Question 350
At Fictional Copperfield Systems, the ISO/IEC 42001 implementation planning program is undergoing an ISO/IEC 42001 implementation review following an interrupted model release. The observed failure is: An executive orders a single generic control set for all AI uses regardless of whether the main risk is unsafe autonomy, biased prediction, or privacy loss. The responsible owner must preserve the prior approved state and avoid unnecessary access or policy changes. Which proposed shortcut must be REJECTED because it weakens reliability, correctness, auditability, or access control?
- For Fictional Copperfield Systems while preserving approved oversight, reevaluate selected treatments after incident learning and control effectiveness results.
- For Fictional Copperfield Systems while preserving approved oversight, each priority risk has a documented treatment rationale, residual risk, acceptance authority, and measurable completion evidence.
- For Fictional Copperfield Systems while preserving approved oversight, apply one checklist to every AI system and declare all unique harms adequately treated.
- For Fictional Copperfield Systems while preserving approved oversight, compare applicable avoidance, modification, sharing, and acceptance decisions; select context-specific controls with responsible owners.
Explanation
Correct Answer
C:Do not apply one checklist to every AI system and declare all unique harms adequately treated. Different risk mechanisms demand proportionate treatment and justified control choices rather than uniform implementation for appearance. Compare applicable avoidance, modification, sharing, and acceptance decisions; select context-specific controls with responsible owners. Each priority risk has a documented treatment rationale, residual risk, acceptance authority, and measurable completion evidence.
Incorrect Answers
A:Reevaluate selected treatments after incident learning and control effectiveness results. This is a preventive operational safeguard that reduces recurrence because different risk mechanisms demand proportionate treatment and justified control choices rather than uniform implementation for appearance. It should be retained. The unsafe proposal is apply one checklist to every AI system and declare all unique harms adequately treated.
B:Each priority risk has a documented treatment rationale, residual risk, acceptance authority, and measurable completion evidence. This is measurable acceptance evidence rather than a risky change. It provides evidence that the scoped remediation was successful: Compare applicable avoidance, modification, sharing, and acceptance decisions; select context-specific controls with responsible owners. The unsafe step is to apply one checklist to every AI system and declare all unique harms adequately treated.
D:Compare applicable avoidance, modification, sharing, and acceptance decisions; select context-specific controls with responsible owners. This is the controlled remediation, not the unsafe shortcut. It addresses different risk mechanisms demand proportionate treatment and justified control choices rather than uniform implementation for appearance. The unsafe step is to apply one checklist to every AI system and declare all unique harms adequately treated.
Question 351
At Fictional Stratus Finance, the corporate AI risks and controls planning process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A controlled correction and repeatable evidence are required before wider AIMS rollout. Which scoped implementation action should the AIMS lead take first?
- For Fictional Stratus Finance under the scoped AI governance decision, create a traceable use-case register covering purposes, stakeholders, system components, data sources, integrations, ownership, and versions.
- For Fictional Stratus Finance under the scoped AI governance decision, derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
- For Fictional Stratus Finance under the scoped AI governance decision, reassess the decision impact, document a defensible applicability determination, and include oversight where the identified risks warrant it.
- For Fictional Stratus Finance under the scoped AI governance decision, present resource and capacity needs to top management, obtain sponsorship, and fund critical risk and implementation activities.
Explanation
Correct Answer
B:Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
A:Create a traceable use-case register covering purposes, stakeholders, system components, data sources, integrations, ownership, and versions. Incomplete AI system descriptions undermine impact, risk, and resource planning across the full use context. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
C:Reassess the decision impact, document a defensible applicability determination, and include oversight where the identified risks warrant it. Whether a control is needed depends on actual purpose and risk; a superficial internal-use label cannot justify every exclusion. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
D:Present resource and capacity needs to top management, obtain sponsorship, and fund critical risk and implementation activities. AIMS delivery depends on leadership authority and realistic resources, not solely on a policy statement. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
Question 352
At Fictional Stratus Finance, the corporate AI risks and controls planning process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A controlled correction and repeatable evidence are required before wider AIMS rollout. Which underlying mechanism best explains these symptoms?
- For Fictional Stratus Finance under the scoped AI governance decision, risk evaluation is inconsistent when likelihood, consequence, stakeholder impact, and acceptance criteria are not agreed before assessments.
- For Fictional Stratus Finance under the scoped AI governance decision, diffuse accountability creates control gaps unless responsibilities and approval rights are unambiguous for each decision.
- For Fictional Stratus Finance under the scoped AI governance decision, risk treatment cannot demonstrate conformity when legal and contractual requirements for the use context are unknown or outdated.
- For Fictional Stratus Finance under the scoped AI governance decision, a Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
Explanation
Correct Answer
D:A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
A:Risk evaluation is inconsistent when likelihood, consequence, stakeholder impact, and acceptance criteria are not agreed before assessments. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
B:Diffuse accountability creates control gaps unless responsibilities and approval rights are unambiguous for each decision. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
C:Risk treatment cannot demonstrate conformity when legal and contractual requirements for the use context are unknown or outdated. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
Question 353
At Fictional Stratus Finance, the corporate AI risks and controls planning process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A controlled correction and repeatable evidence are required before wider AIMS rollout. Which observable acceptance test most directly shows that this defect is fixed?
- For Fictional Stratus Finance under the scoped AI governance decision, a simulated staffing gap is resolved through an approved alternate reviewer without dropping mandatory risk approvals.
- For Fictional Stratus Finance under the scoped AI governance decision, management can compare actual evidence with agreed target values and assign corrective actions to unmet objectives.
- For Fictional Stratus Finance under the scoped AI governance decision, a sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
- For Fictional Stratus Finance under the scoped AI governance decision, the project plan links funded roles and capacity to priority risks, deliverables, and documented executive approvals.
Explanation
Correct Answer
C:A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
Incorrect Answers
A:A simulated staffing gap is resolved through an approved alternate reviewer without dropping mandatory risk approvals. Evidence for aIMS project contingency planning concerns a different issue. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
B:Management can compare actual evidence with agreed target values and assign corrective actions to unmet objectives. Evidence for measurable AIMS objective setting concerns a different issue. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
D:The project plan links funded roles and capacity to priority risks, deliverables, and documented executive approvals. Evidence for leadership resources and sponsorship concerns a different issue. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Question 354
At Fictional Stratus Finance, the corporate AI risks and controls planning process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A controlled correction and repeatable evidence are required before wider AIMS rollout. Which recurring safeguard best prevents this specific failure from recurring?
- For Fictional Stratus Finance under the scoped AI governance decision, update the Statement of Applicability when risk treatment or control implementation changes.
- For Fictional Stratus Finance under the scoped AI governance decision, refresh the stakeholder map after regulatory, contractual, market, and AI-use changes.
- For Fictional Stratus Finance under the scoped AI governance decision, repeat due diligence after significant vendor model, ownership, legal, or data-processing changes.
- For Fictional Stratus Finance under the scoped AI governance decision, maintain the charter through formal change control and review it at major milestones.
Explanation
Correct Answer
A:Update the Statement of Applicability when risk treatment or control implementation changes. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
B:Refresh the stakeholder map after regulatory, contractual, market, and AI-use changes. Interested-party requirements mapping is a separate risk. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Update the Statement of Applicability when risk treatment or control implementation changes.
C:Repeat due diligence after significant vendor model, ownership, legal, or data-processing changes. Supplier due diligence criteria is a separate risk. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Update the Statement of Applicability when risk treatment or control implementation changes.
D:Maintain the charter through formal change control and review it at major milestones. AIMS implementation charter is a separate risk. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Update the Statement of Applicability when risk treatment or control implementation changes.
Question 355
At Fictional Stratus Finance, the corporate AI risks and controls planning process is undergoing an ISO/IEC 42001 implementation review while a new geographic market is onboarded. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A controlled correction and repeatable evidence are required before wider AIMS rollout. Which proposed shortcut must be REJECTED because it weakens reliability, correctness, auditability, or access control?
- For Fictional Stratus Finance under the scoped AI governance decision, a sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
- For Fictional Stratus Finance under the scoped AI governance decision, update the Statement of Applicability when risk treatment or control implementation changes.
- For Fictional Stratus Finance under the scoped AI governance decision, derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
- For Fictional Stratus Finance under the scoped AI governance decision, mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.
Explanation
Correct Answer
D:Do not mark all Annex A controls applicable and complete without checking risk relevance or operating evidence. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
A:A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status. This is measurable acceptance evidence rather than a risky change. It provides evidence that the scoped remediation was successful: Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. The unsafe step is to mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.
B:Update the Statement of Applicability when risk treatment or control implementation changes. This is a preventive operational safeguard that reduces recurrence because a Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. It should be retained. The unsafe proposal is mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.
C:Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. This is the controlled remediation, not the unsafe shortcut. It addresses a Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. The unsafe step is to mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.
Question 356
At Fictional Sandstone Energy, the AIMS project charter and readiness assessment is undergoing an ISO/IEC 42001 implementation review in a controlled AI service transition. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. The implementation may continue only after measurable evidence demonstrates the intended control outcome. Which scoped implementation action should the AIMS lead take first?
- For Fictional Sandstone Energy while preserving approved oversight, identify provider dependencies and plan continuity, change notification, contractual evidence, and exit or fallback arrangements.
- For Fictional Sandstone Energy while preserving approved oversight, derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
- For Fictional Sandstone Energy while preserving approved oversight, identify key-person dependencies, assign deputies, reserve schedule buffers, and define escalation and re-baselining triggers.
- For Fictional Sandstone Energy while preserving approved oversight, define risk-based AI supplier due diligence, evaluate documented assurances, and require evidence and contractual controls proportional to the use.
Explanation
Correct Answer
B:Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
A:Identify provider dependencies and plan continuity, change notification, contractual evidence, and exit or fallback arrangements. External AI dependencies can affect service continuity, risk response, and audit evidence even when procurement manages the commercial relationship. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
C:Identify key-person dependencies, assign deputies, reserve schedule buffers, and define escalation and re-baselining triggers. A program plan must manage delivery risks and dependencies so critical implementation controls are not silently skipped under pressure. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
D:Define risk-based AI supplier due diligence, evaluate documented assurances, and require evidence and contractual controls proportional to the use. Supplier selection should consider governance and AI risk obligations alongside product performance and price. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
Question 357
At Fictional Sandstone Energy, the AIMS project charter and readiness assessment is undergoing an ISO/IEC 42001 implementation review in a controlled AI service transition. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. The implementation may continue only after measurable evidence demonstrates the intended control outcome. Which underlying mechanism best explains these symptoms?
- For Fictional Sandstone Energy while preserving approved oversight, a governance implementation program needs an explicit charter so stakeholders can distinguish authorized scope and success criteria from unbounded aspirations.
- For Fictional Sandstone Energy while preserving approved oversight, a Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
- For Fictional Sandstone Energy while preserving approved oversight, AIMS planning requires knowledge of relevant interested parties and their requirements; a technical-only perspective misses consequential obligations.
- For Fictional Sandstone Energy while preserving approved oversight, AIMS objectives are actionable when they identify measures, responsibilities, time frames, resources, and evaluation methods.
Explanation
Correct Answer
B:A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
A:A governance implementation program needs an explicit charter so stakeholders can distinguish authorized scope and success criteria from unbounded aspirations. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
C:AIMS planning requires knowledge of relevant interested parties and their requirements; a technical-only perspective misses consequential obligations. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
D:AIMS objectives are actionable when they identify measures, responsibilities, time frames, resources, and evaluation methods. AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory.
Question 358
At Fictional Sandstone Energy, the AIMS project charter and readiness assessment is undergoing an ISO/IEC 42001 implementation review in a controlled AI service transition. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. The implementation may continue only after measurable evidence demonstrates the intended control outcome. Which observable acceptance test most directly shows that this defect is fixed?
- For Fictional Sandstone Energy while preserving approved oversight, a simulated staffing gap is resolved through an approved alternate reviewer without dropping mandatory risk approvals.
- For Fictional Sandstone Energy while preserving approved oversight, a simulated high-impact release reaches the designated approver and produces one traceable decision rather than conflicting signatures.
- For Fictional Sandstone Energy while preserving approved oversight, a sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
- For Fictional Sandstone Energy while preserving approved oversight, each priority risk has a documented treatment rationale, residual risk, acceptance authority, and measurable completion evidence.
Explanation
Correct Answer
C:A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
Incorrect Answers
A:A simulated staffing gap is resolved through an approved alternate reviewer without dropping mandatory risk approvals. Evidence for aIMS project contingency planning concerns a different issue. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
B:A simulated high-impact release reaches the designated approver and produces one traceable decision rather than conflicting signatures. Evidence for cross-functional accountability matrix concerns a different issue. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
D:Each priority risk has a documented treatment rationale, residual risk, acceptance authority, and measurable completion evidence. Evidence for risk treatment selection concerns a different issue. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Question 359
At Fictional Sandstone Energy, the AIMS project charter and readiness assessment is undergoing an ISO/IEC 42001 implementation review in a controlled AI service transition. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. The implementation may continue only after measurable evidence demonstrates the intended control outcome. Which recurring safeguard best prevents this specific failure from recurring?
- For Fictional Sandstone Energy while preserving approved oversight, update the Statement of Applicability when risk treatment or control implementation changes.
- For Fictional Sandstone Energy while preserving approved oversight, review interface agreements during new subsidiary, acquisition, or shared-service onboarding.
- For Fictional Sandstone Energy while preserving approved oversight, reforecast staffing and budget at each stage gate and escalate material shortfalls.
- For Fictional Sandstone Energy while preserving approved oversight, review objective relevance and measured outcomes during implementation steering meetings.
Explanation
Correct Answer
A:Update the Statement of Applicability when risk treatment or control implementation changes. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
B:Review interface agreements during new subsidiary, acquisition, or shared-service onboarding. AIMS program boundary design is a separate risk. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Update the Statement of Applicability when risk treatment or control implementation changes.
C:Reforecast staffing and budget at each stage gate and escalate material shortfalls. Leadership resources and sponsorship is a separate risk. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Update the Statement of Applicability when risk treatment or control implementation changes.
D:Review objective relevance and measured outcomes during implementation steering meetings. Measurable AIMS objective setting is a separate risk. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Update the Statement of Applicability when risk treatment or control implementation changes.
Question 360
At Fictional Sandstone Energy, the AIMS project charter and readiness assessment is undergoing an ISO/IEC 42001 implementation review in a controlled AI service transition. The observed failure is: AIMS planners copy all Annex A controls into a document but omit why each control is selected, excluded, or implemented. The implementation may continue only after measurable evidence demonstrates the intended control outcome. Which proposed shortcut must be REJECTED because it weakens reliability, correctness, auditability, or access control?
- For Fictional Sandstone Energy while preserving approved oversight, a sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
- For Fictional Sandstone Energy while preserving approved oversight, update the Statement of Applicability when risk treatment or control implementation changes.
- For Fictional Sandstone Energy while preserving approved oversight, derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence.
- For Fictional Sandstone Energy while preserving approved oversight, mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.
Explanation
Correct Answer
D:Do not mark all Annex A controls applicable and complete without checking risk relevance or operating evidence. A Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status.
Incorrect Answers
A:A sample Annex A control has an auditable applicability rationale, associated risk treatment, owner, and current implementation status. This is measurable acceptance evidence rather than a risky change. It provides evidence that the scoped remediation was successful: Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. The unsafe step is to mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.
B:Update the Statement of Applicability when risk treatment or control implementation changes. This is a preventive operational safeguard that reduces recurrence because a Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. It should be retained. The unsafe proposal is mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.
C:Derive control applicability from risk treatment decisions, record inclusion or exclusion justifications, and track implementation evidence. This is the controlled remediation, not the unsafe shortcut. It addresses a Statement of Applicability needs reasoned control selection and implementation status linked to risk treatment, not a pasted control inventory. The unsafe step is to mark all Annex A controls applicable and complete without checking risk relevance or operating evidence.