Limited Time Discount Offer
30% Off - Ends in 02:00:00

X

Cisco 640-893 Dumps

Cisco
Supporting Cisco Data Center System Devices (DCTECH)
Cisco
Supporting Cisco Data Center System Devices (DCTECH)

Questions & Answers for Cisco 640-893

Showing 1-15 of 68 Questions

Question #1

What is the final step to upgrade the Cisco Integrated Management Controller firmware on
a Cisco UCS Server?

A. Install CIMC firmware

B. Update CIMC firmware

C. Reload CIMC firmware

D. Activate CIMC firmware

Question #2

What happens if you associate a new host firmware package policy to a service profile that
is currently linked to blades?

A. Those blades reboot immediately.

B. The new policy takes effect the next time the blade reboots

C. The administrator must activate the policy

D. The administrator must disassociate/re-associate the service profile to the blade(s) for the new policy to take effect

E. The service profile is disassociated from the blade(s) and must be re-associated by the administrator

Question #3

Your Kickstart file is"ucs-6100-k9-kickstart4 2 1 N1 1 4j bin" To do a password recovery,
which option shows the correct syntax to enter at the loader prompt "loader&gt,"?

A. load distributables/switch/ucs-6100-k9-kickstart.4 2.1 N1.1 4j bin

B. boot distributables/switch/ucs-6100-k9-kickstart4 2 1 N1.1 4j bin

C. load installables/switch/ucs-6100-k9-kickstart4 2 1 N1 1 4j.bin

D. boot installables/switch/ucs-6100-k9-kickstart.4.2.1 N1 1 4j.bin

Question #4


Refer to the exhibit The pictures on the right are the internal components of the Cisco UCS
6250 Blade Server Which component image should be applied to which empty component
block?

A. CPU for block A, adapter card for block B, hard drive for block C. memory for block D

B. CPU for block C. adapter card for block D, hard drive for block A. memory for block B

C. CPU for block B, adapter card for block C, hard drive for block D, memory for block B

D. CPU for block D. adapter card for block A. hard drive for block B. memory for block C

Question #5

The Ethernet specification details several different fiber optic media types, what is the wire
transmission speed for 100BASE-FX Ethernet?

A. 10 Mb/s

B. 100 Mb/s

C. 1000 Mb/s

D. 10000 Mb/s

Question #6

The Ethernet specification details several different unshielded twisted-pair media types
What is the wire transmission speed for 1000BASE-T Ethernet?

A. 1 Mb/s

B. 10 Mb/s

C. 100 Mb/s

D. 1000 Mb/s

E. 10000 Mb/s

Question #7


Refer to the exhibit
Where can you find the model number for the Fibre Channel expansion module?

A. A -FC Mode end-host

B. B - Expansion Module 2

C. C- Part Details

D. D - VLAN Port Count

Question #9

The Ethernet specification details several different fiber optic media types. What is the wire
transmission speeds for 1000BASE-LX Ethernet?

A. 1 Mb/s

B. 10 Mb/s

C. 100 Mb/s

D. 1000 Mb/s

Question #10

Which processor option is supported in the Cisco UCS C250 M2 Server?

A. up to two Intel Xeon 5500 series multicore processors

B. up to two Intel Xeon 5600 series multicore processors

C. up to four Intel Xeon 5600 series multicore processors

D. two or four Intel Xeon 7500 series multicore processors

Question #11

When should an antistatic wrist strap should be worn?

A. when using the crimping tool with an integrated wire cutter and wire stripper

B. when inserting a loopback plug into a router interface

C. when using a flash card reader to copy Cisco IOS images

D. when installing or uninstalling Cisco devices or electronics

Question #12

If the Overall Status for a Cisco UCS B-Series Blade Server indicates a failure in the Cisco
UCS Manager, such as discovery-failed, which statement is true?

A. The server shuts down

B. The server automatically reboots reboot in 3 minutes

C. The endpoints on that server cannot be upgraded.

D. The server is online but the administrator cannot assign a server profile to that blade

Question #13

Which action should the administrator take before physically removing a blade server for
maintenance or replacement?

A. Force the server to shut down

B. Disassociate the service profile

C. Decommission the server

D. Perform a graceful shutdown of the server

Question #14

What does the system status LED look like when an over temperature or major alarm
occurs on the Cisco UCS 6120XP Fabric Interconnect?

A. Amber

B. Red

C. Blinking amber

D. Blinking red

Question #15

Which four tools should a network administrator have when installing hardware? (Choose
four.)

A. rubber mallet

B. screwdriver set that includes varying sizes of standard and Phillips heads

C. crimping tool with an integrated wire cutter and wire stripper

D. utility knife

E. soldering iron with grounded tip

F. cable wraps to help with cable management

×